If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0484060810000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.126749,"lon":-110.843416,"icon":""}]} |
Location: 00/10-08-048-06W4/0 | |
Location Alias: 00/10-08-48-06 W4M | |
Location Alias 2: 00/10-08-048-06 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 4 | |
Range: 06 | |
Section: 08 | |
County/Municipality: County of Vermilion River | |
Well Name: CNRL WILDMERE 10-8-48-6 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0071141 | |
License Date: 1978-08-04 | |
License Status: RecCertified | |
Spud Date: 1978-10-01 | |
Final Drill Date: 1978-10-04 | |
Well Total Depth: 724.00 m | |
Surface Hole Latitude: 53.126749 | |
Surface Hole Longitude: -110.843416 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1978-08-04 | Obtained License |
1978-10-04 | Finished Drilling |
1978-10-04 | Well Mode changed to Drilled and Cased |
1978-10-05 | Drill Stem Test Performed |
1978-10-06 | Production Casing Operation Performed |
1979-01-07 | Perforation Treatment Performed - Jet Perforation |
1979-01-13 | Well Began Production |
1979-01-13 | Well Fluid changed to Crude Oil |
1979-01-13 | Well Mode changed to Pumping |
1979-04-04 | Well Fluid changed to Crude Oil |
1979-04-04 | Well Mode changed to Suspended |
1984-08-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1984-08-09 | Perforation Treatment Performed - Jet Perforation |
1984-08-09 | Plug Back Performed |
1984-08-09 | Well Fluid changed to Crude Oil |
1984-08-09 | Well Mode changed to Abandoned Zone |
1998-08-24 | Well Log Performed |
1998-09-17 | Perforation Treatment Performed - Cement Squeeze |
1998-09-17 | Plug Back Performed |
1998-10-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-10-08 | Perforation Treatment Performed - Jet Perforation |
1998-10-08 | Perforation Treatment Performed - Remedial Casing |
1998-10-08 | Well Log Performed |
2000-01-05 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2000-01-06 | Perforation Treatment Performed - Cement Plug |
2000-01-06 | Perforation Treatment Performed - Remedial Casing |
2000-07-18 | Perforation Treatment Performed - Jet Perforation |
2000-07-18 | Well Log Performed |
2000-07-19 | Perforation Treatment Performed - Cement Plug |
2000-07-19 | Perforation Treatment Performed - Remedial Casing |
2000-09-06 | Perforation Treatment Performed - Jet Perforation |
2000-09-06 | Perforation Treatment Performed - Remedial Casing |
2000-09-06 | Well Log Performed |
2000-09-07 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-01-07 | Perforation | 684.50 | 686.00 | 14 |
2000-01-06 | Cement Plug | 441.00 | 451.00 | 0 |
2000-07-18 | Perforation | 372.00 | 375.00 | 13 |
2000-07-19 | Remedial Casing Cementing | 372.00 | 375.00 | 0 |
2000-07-19 | Cement Plug | 341.00 | 375.00 | 0 |
2000-09-06 | Perforation | 194.00 | 195.00 | 17 |
2000-09-06 | Remedial Casing Cementing | 194.00 | 195.00 | 0 |
1984-08-09 | Packing Device Capped w/Cement | 669.00 | 677.00 | 0 |
1984-08-09 | Perforation | 645.50 | 646.50 | 13 |
1998-09-17 | Cement Squeeze | 645.50 | 646.50 | 0 |
1998-10-08 | Perforation | 596.00 | 597.00 | 20 |
1998-10-08 | Remedial Casing Cementing | 596.00 | 597.00 | 0 |
1998-10-08 | Packing Device Capped w/Cement | 587.30 | 595.30 | 0 |
2000-01-05 | Hydra Jet Perforation | 448.00 | 449.00 | 20 |
2000-01-06 | Remedial Casing Cementing | 448.00 | 449.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1979 | 115 | 0.0 | 0.0 | 0.0 |
For data sources see[5]