X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484053015000

Well Details

Well ID: 0484053015000
Loading map...
Location: 00/15-30-048-05W4/0
Location Alias: 00/15-30-48-05 W4M
Location Alias 2: 00/15-30-048-05 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 05
Section: 30
County/Municipality: County of Vermilion River
Well Name: CREW WILDMERE 15-30-48-5
Operator Name: Crew Energy Inc.
License Number: 0454128
License Date: 2013-01-25
License Status: Issued
Spud Date: 2013-02-24
Final Drill Date: 2013-02-27
Well Total Depth: 828.00 m
Surface Hole Latitude: 53.172431
Surface Hole Longitude: -110.726755

For data sources see[1][2]

Well History

Date Event
2013-01-25 Obtained License
2013-02-25 Direction Drilling Operation Performed - Deviate
2013-02-25 Surface Casing Operation Performed
2013-02-27 Finished Drilling
2013-02-27 Well Log Performed
2013-02-27 Well Mode changed to Drilled and Cased
2013-02-28 Production Casing Operation Performed
2013-02-28 Rig Released
2013-03-25 Perforation Treatment Performed - Jet Perforation
2013-04-02 Perforation Treatment Performed - Jet Perforation
2013-04-17 Well Began Production
2013-04-17 Well Fluid changed to Crude Oil
2013-04-17 Well Mode changed to Pumping
2013-07-13 Perforation Treatment Performed - Jet Perforation
2013-09-30 Well Fluid changed to Crude Oil
2013-09-30 Well Mode changed to Suspended
2013-10-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-10-15 Plug Back Performed
2013-10-16 Perforation Treatment Performed - Jet Perforation
2019-05-03 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-02-24 Champion Drilling Inc. 305 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-02-25 131.00 Deviate (5 - 79 degrees)

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-03-25 Perforation 815.50 817.50 13
2013-03-25 Perforation 815.50 817.50 17
2013-04-02 Perforation 776.50 779.50 13
2013-04-02 Perforation 776.50 779.50 17
2013-07-13 Perforation 780.50 783.50 13
2013-10-15 Packing Device Capped w/Cement 760.80 768.80 0
2013-10-16 Perforation 651.00 653.50 13
2013-10-16 Perforation 651.00 653.50 17
2019-05-03 Perforation 659.50 661.50 13

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 2400 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-02-28 No Incident Encountered 0.00 0.00
2013-04-04 No Incident Encountered 0.00 0.00
2013-07-16 No Incident Encountered 0.00 0.00
2013-10-16 No Incident Encountered 0.00 0.00
2019-05-03 No Incident Encountered 0.00 0.00

For data sources see[8]

References