X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484052008022

Well Details

Well ID: 0484052008022
Loading map...
Location: 02/08-20-048-05W4/2
Location Alias: 02/08-20-48-05 W4M
Location Alias 2: 02/08-20-048-05 W4/02
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 05
Section: 20
County/Municipality: County of Vermilion River
Well Name: VH1 102 WILD 8-20-48-5
Operator Name: Harvest Operations Corp.
License Number: 0309699
License Date: 2004-06-04
License Status: Suspension
Spud Date: 2004-06-21
Final Drill Date: 2004-06-23
Well Total Depth: 776.00 m
Surface Hole Latitude: 53.154575
Surface Hole Longitude: -110.693611

For data sources see[1][2]

Well History

Date Event
2004-06-04 Obtained License
2004-06-21 Surface Casing Operation Performed
2004-06-22 Direction Drilling Operation Performed - Deviate
2004-06-23 Finished Drilling
2004-06-23 Well Mode changed to Drilled and Cased
2004-06-24 Production Casing Operation Performed
2004-06-24 Rig Released
2004-06-24 Well Log Performed
2004-07-15 Perforation Treatment Performed - Jet Perforation
2004-07-15 Well Log Performed
2005-12-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-12-12 Plug Back Performed
2005-12-13 Perforation Treatment Performed - Jet Perforation
2005-12-13 Well Log Performed
2006-02-13 Well Began Production
2006-02-13 Well Fluid changed to Crude Oil
2006-02-13 Well Mode changed to Pumping
2007-12-01 Well Fluid changed to Crude Oil
2007-12-01 Well Mode changed to Suspended
2007-12-02 Well Fluid changed to Crude Oil
2007-12-02 Well Mode changed to Pumping
2011-02-25 Well Fluid changed to Crude Oil
2011-02-25 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2004-06-22 134.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-07-15 Perforation 713.00 715.50 26
2005-12-12 Packing Device Capped w/Cement 700.00 708.00 0
2005-12-13 Perforation 670.00 672.00 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 936 0.0 0.0 0.0
2007 48 0.0 0.0 0.0

For data sources see[6]

References