If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0484051605000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.136094,"lon":-110.683239,"icon":""}]} |
Location: 00/05-16-048-05W4/0 | |
Location Alias: 00/05-16-48-05 W4M | |
Location Alias 2: 00/05-16-048-05 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 4 | |
Range: 05 | |
Section: 16 | |
County/Municipality: County of Vermilion River | |
Well Name: MARWAYNE OILS VCO 1 | |
Operator Name: Marwayne Oils Limited | |
License Number: 0004412 | |
License Date: 1952-03-21 | |
License Status: RecExempt | |
Spud Date: 1952-04-22 | |
Final Drill Date: 1952-05-03 | |
Well Total Depth: 615.70 m | |
Surface Hole Latitude: 53.136094 | |
Surface Hole Longitude: -110.683239 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1952-03-21 | Obtained License |
1952-04-30 | Drill Stem Test Performed |
1952-05-01 | Drill Stem Test Performed |
1952-05-02 | Drill Stem Test Performed |
1952-05-03 | Finished Drilling |
1952-11-20 | Production Casing Operation Performed |
1953-01-18 | Well Abandoned |
1953-01-18 | Well Mode changed to Abandoned |
1956-11-26 | Perforation Treatment Performed - Bullet Perforation |
2009-11-30 | Production Casing Operation Performed |
2009-12-04 | Well Log Performed |
2010-01-31 | Well Log Performed |
2010-02-13 | Perforation Treatment Performed - Jet Perforation |
2010-02-13 | Well Log Performed |
2010-02-20 | Perforation Treatment Performed - Cement Plug |
2010-02-20 | Perforation Treatment Performed - Cement Squeeze |
2010-12-02 | Perforation Treatment Performed - Jet Perforation |
2010-12-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-12-06 | Perforation Treatment Performed - Cement Squeeze |
2010-12-07 | Perforation Treatment Performed - Jet Perforation |
2010-12-08 | Perforation Treatment Performed - Cement Plug |
2010-12-08 | Perforation Treatment Performed - Cement Squeeze |
2010-12-10 | Perforation Treatment Performed - Jet Perforation |
2010-12-13 | Perforation Treatment Performed - Cement Plug |
2010-12-13 | Perforation Treatment Performed - Cement Squeeze |
2010-12-13 | Perforation Treatment Performed - Jet Perforation |
2010-12-15 | Well Log Performed |
2010-12-18 | Perforation Treatment Performed - Cement Plug |
2010-12-18 | Perforation Treatment Performed - Cement Squeeze |
2010-12-18 | Plug Back Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1956-11-26 | Bullet Perforation | 579.40 | 583.40 | 3 |
2010-12-08 | Cement Plug | 140.70 | 210.00 | 0 |
2010-12-10 | Perforation | 120.70 | 121.70 | 17 |
2010-12-13 | Cement Squeeze | 120.70 | 121.70 | 0 |
2010-12-13 | Cement Plug | 104.00 | 121.70 | 0 |
2010-12-13 | Perforation | 84.00 | 85.00 | 17 |
2010-12-18 | Cement Squeeze | 84.00 | 85.00 | 0 |
2010-12-18 | Cement Plug | 8.30 | 85.00 | 0 |
2010-02-13 | Perforation | 458.00 | 459.00 | 17 |
2010-02-20 | Cement Squeeze | 458.00 | 459.00 | 0 |
2010-02-20 | Cement Plug | 367.00 | 459.00 | 0 |
2010-12-02 | Perforation | 279.00 | 280.00 | 21 |
2010-12-06 | Cement Squeeze | 279.00 | 280.00 | 0 |
2010-12-06 | Packing Device Capped w/Cement | 258.40 | 270.40 | 0 |
2010-12-07 | Perforation | 209.00 | 210.00 | 20 |
2010-12-08 | Cement Squeeze | 209.00 | 210.00 | 0 |
For data sources see[4]