If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0484040915030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.128463,"lon":-110.544608,"icon":""}]} |
Location: 03/15-09-048-04W4/0 | |
Location Alias: 03/15-09-48-04 W4M | |
Location Alias 2: 03/15-09-048-04 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 4 | |
Range: 04 | |
Section: 09 | |
County/Municipality: County of Vermilion River | |
Well Name: DAYLIGHT HZ 103 WILDMERE 15-9-48-4 | |
Operator Name: Gear Energy Ltd. | |
License Number: 0400750 | |
License Date: 2008-09-10 | |
License Status: Suspension | |
Spud Date: 2009-08-24 | |
Final Drill Date: 2009-08-31 | |
Well Total Depth: 1850.70 m | |
Surface Hole Latitude: 53.128463 | |
Surface Hole Longitude: -110.544608 |
Date | Event |
---|---|
2008-09-10 | Obtained License |
2009-08-25 | Surface Casing Operation Performed |
2009-08-26 | Direction Drilling Operation Performed - Horizontal |
2009-08-28 | Intermediate Casing Operation Performed |
2009-08-31 | Finished Drilling |
2009-08-31 | Well Mode changed to Drilled and Cased |
2009-09-01 | Liner Casing Operation Performed |
2009-09-01 | Perforation Treatment Performed - Open-Hole Completion |
2009-09-01 | Perforation Treatment Performed - Slotted Liner or Casing |
2009-09-01 | Rig Released |
2009-09-01 | Well Fluid changed to Crude Oil |
2009-09-01 | Well Mode changed to Potential |
2011-09-30 | Well Began Production |
2011-09-30 | Well Fluid changed to Crude Oil |
2011-09-30 | Well Mode changed to Pumping |
2011-10-01 | Well Fluid changed to Crude Oil |
2011-10-01 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-08-26 | 350.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-09-01 | Slotted Liner | 921.50 | 1849.60 | 0 |
2009-09-01 | Open Hole/Barefoot Completion | 1849.60 | 1850.70 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 719 | 0.0 | 0.0 | 0.0 |
2010 | 96 | 0.0 | 0.0 | 0.0 |
For data sources see[6]