If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0484040809020 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
| Location: 02/09-08-048-04W4/0 | |
| Location Alias: 02/09-08-48-04 W4M | |
| Location Alias 2: 02/09-08-048-04 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 048 | |
| Meridian: 4 | |
| Range: 04 | |
| Section: 08 | |
| County/Municipality: County of Vermilion River | |
| Well Name: GEAR HZ 102 WILDMERE 9-8-48-4 | |
| Operator Name: Gear Energy Ltd. | |
| License Number: 0448195 | |
| License Date: 2012-08-31 | |
| License Status: Issued | |
| Spud Date: 2012-09-10 | |
| Final Drill Date: 2012-09-15 | |
| Well Total Depth: 1609.00 m | |
| Surface Hole Latitude: 53.128035 | |
| Surface Hole Longitude: -110.558278 |
| Date | Event |
|---|---|
| 2012-08-31 | Obtained License |
| 2012-09-10 | Surface Casing Operation Performed |
| 2012-09-10 | Well Log Performed |
| 2012-09-11 | Direction Drilling Operation Performed - Deviate |
| 2012-09-13 | Intermediate Casing Operation Performed |
| 2012-09-13 | Well Log Performed |
| 2012-09-14 | Direction Drilling Operation Performed - Horizontal |
| 2012-09-15 | Finished Drilling |
| 2012-09-15 | Well Log Performed |
| 2012-09-15 | Well Mode changed to Drilled and Cased |
| 2012-09-16 | Liner Casing Operation Performed |
| 2012-09-16 | Perforation Treatment Performed - Slotted Liner or Casing |
| 2012-09-16 | Rig Released |
| 2012-09-21 | Well Log Performed |
| 2012-09-25 | Well Began Production |
| 2012-09-25 | Well Fluid changed to Crude Oil |
| 2012-09-25 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-09-10 | Trinidad Drilling Ltd. | 7 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-09-11 | 289.00 | Deviate (5 - 79 degrees) |
| 2012-09-14 | 880.00 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-09-16 | Slotted Liner | 874.20 | 1608.80 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 2352 | 0.0 | 0.0 | 0.0 |
| 2013 | 8267 | 0.0 | 0.0 | 0.0 |
| 2014 | 8736 | 0.0 | 0.0 | 0.0 |
| 2015 | 8754 | 0.0 | 0.0 | 0.0 |
| 2016 | 8781 | 0.0 | 0.0 | 0.0 |
| 2017 | 8495 | 0.0 | 0.0 | 0.0 |
| 2018 | 8731 | 0.0 | 0.0 | 0.0 |
| 2019 | 8656 | 0.0 | 0.0 | 0.0 |
| 2020 | 2175 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-09-16 | No Incident Encountered | 0.00 | 0.00 |
| 2012-09-25 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]