X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484023608002

Well Details

Well ID: 0484023608002
Loading map...
Location: 00/08-36-048-02W4/2
Location Alias: 00/08-36-48-02 W4M
Location Alias 2: 00/08-36-048-02 W4/02
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 02
Section: 36
County/Municipality: County of Vermilion River
Well Name: CNRL 8D LLOYD 8-36-48-2
Operator Name: Canadian Natural Resources Limited
License Number: 0306157
License Date: 2004-03-19
License Status: Suspension
Spud Date: 2004-06-08
Final Drill Date: 2004-06-10
Well Total Depth: 713.00 m
Surface Hole Latitude: 53.183912
Surface Hole Longitude: -110.157264

For data sources see[1][2]

Well History

Date Event
2004-03-19 Obtained License
2004-06-08 Direction Drilling Operation Performed - Deviate
2004-06-08 Surface Casing Operation Performed
2004-06-10 Finished Drilling
2004-06-10 Well Log Performed
2004-06-10 Well Mode changed to Drilled and Cased
2004-06-11 Production Casing Operation Performed
2004-06-11 Rig Released
2004-07-13 Perforation Treatment Performed - Jet Perforation
2004-07-13 Well Log Performed
2005-01-24 Well Log Performed
2006-04-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-04-10 Plug Back Performed
2006-04-11 Perforation Treatment Performed - Jet Perforation
2006-04-11 Well Log Performed
2006-04-12 Well Began Production
2006-04-12 Well Fluid changed to Crude Oil
2006-04-12 Well Mode changed to Pumping
2006-12-03 Well Fluid changed to Crude Oil
2006-12-03 Well Mode changed to Suspended
2014-10-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-10-11 Plug Back Performed
2014-10-11 Well Fluid changed to Crude Oil
2014-10-11 Well Mode changed to Abandoned Zone
2015-09-04 Well Log Performed
2015-10-14 Perforation Treatment Performed - Jet Perforation
2015-10-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-10-15 Perforation Treatment Performed - Remedial Casing
2018-09-10 Well Log Performed
2018-09-14 Perforation Treatment Performed - Jet Perforation
2018-09-14 Well Log Performed
2018-09-17 Perforation Treatment Performed - Cement Plug
2018-09-17 Perforation Treatment Performed - Remedial Casing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2004-06-08 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-07-13 Perforation 650.00 653.00 26
2018-09-17 Cement Plug 316.20 325.00 0
2006-04-10 Packing Device Capped w/Cement 635.70 643.70 0
2006-04-11 Perforation 607.50 609.50 26
2014-10-11 Packing Device Capped w/Cement 572.50 597.50 0
2015-10-14 Perforation 544.00 546.00 20
2015-10-15 Remedial Casing Cementing 544.00 546.00 0
2015-10-15 Packing Device Capped w/Cement 520.60 539.00 0
2018-09-14 Perforation 330.00 331.30 13
2018-09-17 Remedial Casing Cementing 330.00 331.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 521 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-10-10 No Incident Encountered 0.00 0.00
2015-10-15 No Incident Encountered 0.00 0.00
2018-09-17 No Incident Encountered 0.00 0.00

For data sources see[7]

References