X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484013012040

Well Details

Well ID: 0484013012040
Loading map...
Location: 04/12-30-048-01W4/0
Location Alias: 04/12-30-48-01 W4M
Location Alias 2: 04/12-30-048-01 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 01
Section: 30
County/Municipality: County of Vermilion River
Well Name: HUSKY HZ 104 LLOYD 12-30-48-1
Operator Name: Husky Oil Operations Limited
License Number: 0401995
License Date: 2008-10-08
License Status: Suspension
Spud Date: 2008-11-05
Final Drill Date: 2008-11-12
Well Total Depth: 1524.00 m
Surface Hole Latitude: 53.170118
Surface Hole Longitude: -110.135149

For data sources see[1][2]

Well History

Date Event
2008-10-08 Obtained License
2008-11-06 Surface Casing Operation Performed
2008-11-07 Direction Drilling Operation Performed - Deviate
2008-11-08 Direction Drilling Operation Performed - Horizontal
2008-11-08 Well Log Performed
2008-11-10 Intermediate Casing Operation Performed
2008-11-12 Finished Drilling
2008-11-12 Well Log Performed
2008-11-12 Well Mode changed to Drilled and Cased
2008-11-13 Liner Casing Operation Performed
2008-11-13 Perforation Treatment Performed - Open-Hole Completion
2008-11-13 Perforation Treatment Performed - Slotted Liner or Casing
2008-11-14 Rig Released
2009-02-10 Well Began Production
2009-02-10 Well Fluid changed to Crude Oil
2009-02-10 Well Mode changed to Pumping
2012-07-18 Well Fluid changed to Crude Oil
2012-07-18 Well Mode changed to Suspended
2013-12-09 Well Log Performed
2013-12-10 Perforation Treatment Performed - Jet Perforation
2013-12-10 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2013-12-10 Well Log Performed
2013-12-13 Perforation Treatment Performed - Cement Squeeze
2013-12-14 Perforation Treatment Performed - Cement Plug
2014-09-20 Well Log Performed
2014-09-30 Well Log Performed
2014-11-28 Perforation Treatment Performed - Jet Perforation
2014-11-28 Well Log Performed
2014-11-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-11-29 Perforation Treatment Performed - Jet Perforation
2014-11-29 Well Log Performed
2014-12-01 Perforation Treatment Performed - Jet Perforation
2014-12-01 Well Log Performed
2014-12-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-12-03 Perforation Treatment Performed - Remedial Casing
2018-03-01 Well Log Performed
2018-03-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-03-17 Perforation Treatment Performed - Jet Perforation
2018-03-17 Well Log Performed
2018-03-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-03-18 Perforation Treatment Performed - Cement Plug
2018-03-18 Perforation Treatment Performed - Jet Perforation
2018-03-18 Perforation Treatment Performed - Remedial Casing
2018-03-18 Well Log Performed
2018-03-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-03-20 Perforation Treatment Performed - Cement Plug
2018-03-20 Perforation Treatment Performed - Jet Perforation
2018-03-20 Perforation Treatment Performed - Remedial Casing
2018-03-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-03-21 Perforation Treatment Performed - Cement Plug
2018-03-21 Perforation Treatment Performed - Remedial Casing
2018-03-21 Plug Back Performed
2018-03-21 Well Fluid changed to Crude Oil
2018-03-21 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-11-07 345.20 Deviate (5 - 79 degrees)
2008-11-08 742.60 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-11-13 Slotted Liner 810.50 1518.00 0
2014-11-29 Perforation 238.00 239.00 20
2014-12-01 Perforation 238.00 239.00 20
2014-12-01 Perforation 234.00 235.00 20
2014-12-03 Remedial Casing Cementing 234.00 239.00 0
2014-12-03 Packing Device Capped w/Cement 221.20 230.80 0
2018-03-16 Packing Device Capped w/Cement 412.00 420.00 0
2018-03-17 Perforation 386.00 389.00 39
2018-03-18 Remedial Casing Cementing 386.00 389.00 0
2018-03-18 Cement Plug 383.00 389.00 0
2018-03-18 Packing Device Capped w/Cement 375.00 383.00 0
2008-11-13 Open Hole/Barefoot Completion 1518.00 1524.00 0
2018-03-18 Perforation 315.50 318.50 39
2018-03-20 Remedial Casing Cementing 315.50 318.50 0
2018-03-20 Cement Plug 313.00 318.50 0
2018-03-20 Packing Device Capped w/Cement 305.00 313.00 0
2018-03-20 Perforation 290.00 291.00 20
2018-03-21 Remedial Casing Cementing 290.00 291.00 0
2018-03-21 Cement Plug 287.00 291.00 0
2018-03-21 Packing Device Capped w/Cement 279.00 287.00 0
2018-03-21 Packing Device Capped w/Cement 222.00 230.00 0
2013-12-10 Packing Dev Cpd w/Res-Gyp Cem 687.20 801.00 0
2013-12-10 Perforation 422.10 425.10 17
2013-12-10 Perforation 422.10 425.10 20
2013-12-13 Cement Squeeze 422.10 425.10 0
2013-12-14 Cement Plug 409.20 417.20 0
2014-11-28 Perforation 290.00 291.00 20
2014-11-29 Packing Device Capped w/Cement 276.80 284.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 7559 0.0 0.0 0.0
2010 7287 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-12-14 No Incident Encountered 0.00 0.00
2014-12-03 No Incident Encountered 0.00 0.00
2018-03-21 No Incident Encountered 0.00 0.00

For data sources see[7]

References