X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484012406000

Well Details

Well ID: 0484012406000
Loading map...
Location: 00/06-24-048-01W4/0
Location Alias: 00/06-24-48-01 W4M
Location Alias 2: 00/06-24-048-01 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 01
Section: 24
County/Municipality: County of Vermilion River
Well Name: PVR WESTCOAST LLOYD 6B-24-48-1
Operator Name: Canadian Natural Resources Limited
License Number: 0066050
License Date: 1977-10-06
License Status: Abandoned
Spud Date: 1977-10-06
Final Drill Date: 1977-10-08
Well Total Depth: 649.20 m
Surface Hole Latitude: 53.150961
Surface Hole Longitude: -110.023102

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-10-06 Obtained License
1977-10-08 Finished Drilling
1977-10-08 Well Mode changed to Drilled and Cased
1977-10-10 Production Casing Operation Performed
1977-10-21 Perforation Treatment Performed - Jet Perforation
1978-01-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-01-24 Perforation Treatment Performed - Jet Perforation
1978-01-25 Well Began Production
1978-01-25 Well Fluid changed to Crude Oil
1978-01-25 Well Mode changed to Pumping
1979-07-01 Well Fluid changed to Crude Oil
1979-07-01 Well Mode changed to Suspended
1981-05-01 Well Fluid changed to Crude Oil
1981-05-01 Well Mode changed to Pumping
1981-07-01 Well Fluid changed to Crude Oil
1981-07-01 Well Mode changed to Suspended
1991-01-01 Well Fluid changed to Crude Oil
1991-01-01 Well Mode changed to Pumping
1996-07-01 Well Fluid changed to Crude Oil
1996-07-01 Well Mode changed to Suspended
1999-09-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-09-08 Plug Back Performed
1999-09-08 Well Fluid changed to Crude Oil
1999-09-08 Well Mode changed to Abandoned Zone
1999-09-09 Perforation Treatment Performed - Jet Perforation
1999-09-09 Well Log Performed
1999-09-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-09-10 Perforation Treatment Performed - Remedial Casing
2000-06-06 Perforation Treatment Performed - Abrasa-Jet Perforation
2000-06-07 Perforation Treatment Performed - Remedial Casing
2000-08-23 Perforation Treatment Performed - Remedial Casing
2000-09-14 Perforation Treatment Performed - Jet Perforation
2000-09-14 Well Log Performed
2000-09-16 Perforation Treatment Performed - Remedial Casing
2001-06-23 Perforation Treatment Performed - Jet Perforation
2001-06-23 Well Log Performed
2001-06-25 Perforation Treatment Performed - Remedial Casing
2001-09-14 Perforation Treatment Performed - Jet Perforation
2001-09-14 Perforation Treatment Performed - Remedial Casing
2001-09-14 Plug Back Performed
2001-09-14 Well Log Performed
2002-09-16 Perforation Treatment Performed - Jet Perforation
2002-09-16 Well Log Performed
2002-09-20 Perforation Treatment Performed - Chemical Squeeze
2002-09-20 Perforation Treatment Performed - Remedial Casing
2002-09-20 Plug Back Performed
2002-12-18 Well Abandoned
2002-12-18 Well Fluid changed to Crude Oil
2002-12-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-10-21 Perforation 630.00 632.20 13
1999-09-10 Remedial Casing Cementing 394.00 395.00 0
2000-06-06 Hydra Jet Perforation 350.50 350.50 0
2000-06-06 Hydra Jet Perforation 350.00 350.00 0
2000-06-07 Remedial Casing Cementing 350.00 350.50 0
2000-08-23 Remedial Casing Cementing 350.00 350.50 0
2000-09-14 Perforation 427.00 428.00 13
2000-09-14 Perforation 413.50 414.50 13
2000-09-16 Remedial Casing Cementing 413.00 428.00 0
2001-06-23 Perforation 294.00 295.00 72
2001-06-23 Perforation 293.00 294.00 72
1978-01-24 Packing Device Capped w/Cement 617.20 617.20 0
2001-06-25 Remedial Casing Cementing 294.00 295.00 0
2001-06-25 Remedial Casing Cementing 293.00 294.00 0
2001-09-14 Perforation 280.50 283.50 14
2001-09-14 Remedial Casing Cementing 280.50 283.50 0
2002-09-16 Perforation 117.50 119.00 13
2002-09-20 Chemical Squeeze 117.50 119.00 0
2002-09-20 Remedial Casing Cementing 117.50 119.00 0
1978-01-24 Perforation 570.60 571.20 13
1978-01-24 Perforation 571.80 572.40 13
1978-01-24 Perforation 573.00 573.60 13
1978-01-24 Perforation 574.20 576.40 13
1999-09-08 Packing Device Capped w/Cement 557.00 565.00 0
1999-09-09 Perforation 394.00 395.00 14
1999-09-10 Acid Treatment 394.00 395.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 1 0.0 0.0 0.0
1978 4488 0.0 0.0 0.0
1979 768 0.0 0.0 0.0
1981 48 0.0 0.0 0.0
1991 6323 0.0 0.0 0.0
1992 5232 0.0 0.0 0.0
1993 1994 0.0 0.0 0.0
1994 0 0.0 0.0 0.0

For data sources see[5]

References