X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475212106003

Well Details

Well ID: 0475212106003
Loading map...
Location: 00/06-21-047-21W5/3
Location Alias: 00/06-21-47-21 W5M
Location Alias 2: 00/06-21-047-21 W5/03
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 21
Section: 21
County/Municipality: Yellowhead County
Well Name: Canlin MOUNTAIN 7-21-47-21
Operator Name: Canlin Energy Corporation
License Number: 0051796
License Date: 1974-11-07
License Status: Amended
Spud Date: 1999-08-01
Final Drill Date: 1999-08-28
Well Total Depth: 3311.00 m
Surface Hole Latitude: 53.066067
Surface Hole Longitude: -117.010825

For data sources see[1][2]

Well History

Date Event
1974-11-07 Obtained License
1999-07-24 Well Log Performed
1999-07-25 Well Log Performed
1999-08-01 Direction Drilling Operation Performed - Deviate
1999-08-15 Well Log Performed
1999-08-19 Liner Casing Operation Performed
1999-08-25 Well Log Performed
1999-08-26 Well Log Performed
1999-08-28 Finished Drilling
1999-08-28 Well Log Performed
1999-08-29 Well Log Performed
1999-08-30 Perforation Treatment Performed - Open-Hole Completion
1999-08-30 Well Log Performed
1999-08-31 Rig Released
1999-08-31 Well Mode changed to Drilled and Cased
1999-09-17 Perforation Treatment Performed - Cement Plug
1999-09-17 Perforation Treatment Performed - Open-Hole Completion
1999-09-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-09-21 Well Log Performed
1999-09-23 Well Log Performed
1999-10-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-10-17 Plug Back Performed
1999-10-19 Perforation Treatment Performed - Jet Perforation
1999-11-08 Well Began Production
1999-11-08 Well Fluid changed to Gas
1999-11-08 Well Mode changed to Flowing
2018-01-01 Well Fluid changed to Gas
2018-01-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1999-08-01 2539.30 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-08-30 Open Hole/Barefoot Completion 3204.00 3311.00 0
1999-09-17 Cement Plug 3241.00 3254.00 0
1999-09-17 Open Hole/Barefoot Completion 3204.00 3241.00 0
1999-09-18 Acid Treatment 3210.00 3241.00 0
1999-10-17 Packing Device Capped w/Cement 3145.50 3153.50 0
1999-10-19 Perforation 2904.00 2907.00 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 1066 0.0 0.0 0.0
2000 8321 0.0 0.0 0.0
2001 7439 0.0 0.0 0.0
2002 8269 0.0 0.0 0.0
2003 8497 0.0 0.0 0.0
2004 8338 0.0 0.0 0.0
2005 7505 0.0 0.0 0.0
2006 7615 0.0 0.0 0.0
2007 8198 0.0 0.0 0.0
2008 8146 0.0 0.0 0.0
2009 8155 0.0 0.0 0.0
2010 8186 0.0 0.0 0.0
2011 7948 0.0 0.0 0.0
2012 7458 0.0 0.0 0.0
2013 8328 0.0 0.0 0.0
2014 7162 0.0 0.0 0.0
2015 6884 0.0 0.0 0.0
2016 7931 0.0 0.0 0.0
2017 8135 0.0 0.0 0.0
2018 8615 0.0 0.0 0.0
2019 7280 0.0 0.0 0.0
2020 2087 0.0 0.0 0.0

For data sources see[6]

References