If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0475180102004 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
| Location: 00/02-01-047-18W5/4 | |
| Location Alias: 00/02-01-47-18 W5M | |
| Location Alias 2: 00/02-01-047-18 W5/04 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 047 | |
| Meridian: 5 | |
| Range: 18 | |
| Section: 01 | |
| County/Municipality: Yellowhead County | |
| Well Name: TAC HANLAN 2-1-47-18 | |
| Operator Name: Tamarack Acquisition Corp. | |
| License Number: 0310761 | |
| License Date: 2004-06-23 | |
| License Status: Suspension | |
| Spud Date: 2004-07-21 | |
| Final Drill Date: 2004-07-26 | |
| Well Total Depth: 4412.90 m | |
| Surface Hole Latitude: 53.019216 | |
| Surface Hole Longitude: -116.494403 |
| Date | Event |
|---|---|
| 1970-01-07 | Surface Casing Operation Performed |
| 1970-07-26 | Production Casing Operation Performed |
| 2004-06-23 | Obtained License |
| 2004-07-26 | Finished Drilling |
| 2004-07-26 | Well Mode changed to Drilled and Cased |
| 2004-07-27 | Rig Released |
| 2004-07-27 | Well Log Performed |
| 2004-07-28 | Well Log Performed |
| 2004-07-29 | Well Log Performed |
| 2004-07-31 | Perforation Treatment Performed - Jet Perforation |
| 2004-08-03 | Perforation Treatment Performed - Bridge Plug No Cement Required |
| 2004-08-03 | Perforation Treatment Performed - Fractured |
| 2004-08-11 | Well Log Performed |
| 2004-08-13 | Perforation Treatment Performed - Jet Perforation |
| 2004-08-13 | Well Log Performed |
| 2004-08-17 | Perforation Treatment Performed - Jet Perforation |
| 2004-08-18 | Perforation Treatment Performed - Cement Squeeze |
| 2004-08-18 | Plug Back Performed |
| 2004-08-19 | Perforation Treatment Performed - Cement Squeeze |
| 2004-08-19 | Plug Back Performed |
| 2004-08-24 | Perforation Treatment Performed - Fractured |
| 2004-08-24 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2004-07-31 | Perforation | 3610.00 | 3614.00 | 17 |
| 2004-08-24 | Perforation | 3232.50 | 3234.30 | 20 |
| 2004-08-24 | Fracture | 3232.50 | 3234.40 | 0 |
| 2004-08-03 | Fracture | 3610.00 | 3614.00 | 0 |
| 2004-08-03 | Bridge Plug, No Cement | 3586.70 | 3596.70 | 0 |
| 2004-08-13 | Perforation | 3217.00 | 3218.00 | 17 |
| 2004-08-13 | Perforation | 3187.00 | 3188.00 | 17 |
| 2004-08-17 | Perforation | 3201.00 | 3202.00 | 17 |
| 2004-08-18 | Cement Squeeze | 3217.00 | 3218.00 | 0 |
| 2004-08-19 | Cement Squeeze | 3187.00 | 3202.00 | 0 |
| 2004-08-24 | Perforation | 3232.60 | 3234.40 | 20 |
For data sources see[4]