X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475151102020

Well Details

Well ID: 0475151102020
Loading map...
Location: 02/02-11-047-15W5/0
Location Alias: 02/02-11-47-15 W5M
Location Alias 2: 02/02-11-047-15 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 15
Section: 11
County/Municipality: Yellowhead County
Well Name: BEC BRAZR 2-11-47-15
Operator Name: Bonavista Energy Corporation
License Number: 0087021
License Date: 1980-11-13
License Status: Abandoned
Spud Date: 1980-11-21
Final Drill Date: 1981-04-10
Well Total Depth: 3950.00 m
Surface Hole Latitude: 53.035837
Surface Hole Longitude: -116.085050

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-11-13 Obtained License
1980-11-21 Direction Drilling Operation Performed - 98
1981-02-01 Lost Circulation Occurred
1981-03-01 Kick Occurred
1981-04-10 Finished Drilling
1981-04-14 Production Casing Operation Performed
1981-04-17 Well Mode changed to Drilled and Cased
1981-10-23 Perforation Treatment Performed - Jet Perforation
1981-11-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-07-01 Well Began Production
1984-07-01 Well Fluid changed to Gas
1984-07-01 Well Mode changed to Flowing
1984-10-06 Perforation Treatment Performed - Fractured
1987-08-18 Perforation Treatment Performed - Jet Perforation
1987-08-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-08-22 Well Began Injection
1987-08-22 Well Fluid changed to Gas
1987-08-22 Well Type changed to Injection
1995-04-01 Well Fluid changed to Gas
1995-04-01 Well Mode changed to Flowing
2006-06-09 Perforation Treatment Performed - Jet Perforation
2006-06-11 Perforation Treatment Performed - Jet Perforation
2006-06-11 Well Log Performed
2006-06-12 Perforation Treatment Performed - Jet Perforation
2007-04-17 Well Fluid changed to Gas
2007-04-17 Well Mode changed to Pumping
2011-10-01 Well Fluid changed to Gas
2011-10-01 Well Mode changed to Suspended
2012-08-30 Well Log Performed
2012-08-31 Well Log Performed
2012-09-01 Well Log Performed
2012-09-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-09-02 Perforation Treatment Performed - Jet Perforation
2012-09-02 Plug Back Performed
2012-09-02 Well Fluid changed to Gas
2012-09-02 Well Log Performed
2012-09-02 Well Mode changed to Abandoned Zone
2012-09-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-09-03 Perforation Treatment Performed - Jet Perforation
2012-09-04 Perforation Treatment Performed - Jet Perforation
2012-09-04 Well Log Performed
2012-09-06 Perforation Treatment Performed - Cement Plug
2012-09-09 Perforation Treatment Performed - Jet Perforation
2012-09-09 Well Log Performed
2012-09-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-09-10 Perforation Treatment Performed - Remedial Casing
2012-09-12 Perforation Treatment Performed - Jet Perforation
2012-09-13 Perforation Treatment Performed - Cement Plug
2012-09-14 Perforation Treatment Performed - Jet Perforation
2012-09-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-09-15 Perforation Treatment Performed - Remedial Casing
2012-09-17 Perforation Treatment Performed - Jet Perforation
2012-09-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-09-18 Perforation Treatment Performed - Remedial Casing
2012-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-09-19 Perforation Treatment Performed - Jet Perforation
2012-09-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-09-20 Perforation Treatment Performed - Jet Perforation
2012-09-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-09-27 Perforation Treatment Performed - Cement Plug
2012-09-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-09-28 Perforation Treatment Performed - Jet Perforation
2012-09-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-09-29 Perforation Treatment Performed - Remedial Casing
2012-10-05 Well Abandoned
2012-10-05 Well Fluid changed to Gas
2012-10-05 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1980-11-21 3570.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-10-23 Perforation 3848.00 3858.00 7
2012-09-02 Packing Device Capped w/Cement 3761.00 3769.00 0
2012-09-02 Perforation 3575.00 3576.00 17
2012-09-02 Packing Device Capped w/Cement 3557.00 3565.00 0
2012-09-03 Perforation 3440.00 3441.00 17
2012-09-03 Packing Device Capped w/Cement 3430.00 3438.00 0
2012-09-03 Perforation 3419.00 3420.00 20
2012-09-03 Packing Device Capped w/Cement 3401.00 3409.00 0
2012-09-04 Perforation 3205.00 3206.00 20
2012-09-04 Perforation 3250.00 3251.00 20
2012-09-04 Perforation 3299.00 3300.00 20
1981-11-14 Acid Treatment 3848.00 3858.00 0
2012-09-04 Perforation 3307.00 3308.00 20
2012-09-04 Perforation 3371.00 3372.00 20
2012-09-06 Cement Plug 3138.70 3392.50 0
2012-09-09 Perforation 3120.00 3121.00 20
2012-09-10 Remedial Casing Cementing 3120.00 3121.00 0
2012-09-10 Packing Device Capped w/Cement 3109.00 3117.00 0
2012-09-12 Perforation 2910.00 2911.00 20
2012-09-12 Perforation 2935.00 2936.00 20
2012-09-12 Perforation 3106.00 3107.00 20
2012-09-13 Cement Plug 2839.90 3109.00 0
1984-10-06 Fracture 3848.00 3858.00 0
2012-09-14 Perforation 2363.00 2364.00 20
2012-09-15 Remedial Casing Cementing 2363.00 2364.00 0
2012-09-15 Packing Device Capped w/Cement 2314.00 2360.00 0
2012-09-17 Perforation 1852.00 1853.00 20
2012-09-18 Remedial Casing Cementing 1852.00 1853.00 0
2012-09-18 Packing Device Capped w/Cement 1840.00 1850.00 0
2012-09-19 Perforation 600.00 601.00 20
2012-09-19 Packing Device Capped w/Cement 587.00 595.00 0
2012-09-19 Perforation 556.00 557.00 20
2012-09-19 Packing Device Capped w/Cement 532.00 540.00 0
1987-08-18 Perforation 3822.00 3841.00 7
2012-09-19 Perforation 502.00 503.00 20
2012-09-20 Packing Device Capped w/Cement 491.00 499.00 0
2012-09-20 Perforation 435.00 436.00 20
2012-09-22 Packing Device Capped w/Cement 426.00 434.00 0
2012-09-27 Cement Plug 384.00 424.50 0
2012-09-28 Perforation 379.00 380.00 20
2012-09-28 Packing Device Capped w/Cement 370.00 378.00 0
2012-09-28 Perforation 352.00 353.00 20
2012-09-29 Remedial Casing Cementing 352.00 353.00 0
2012-09-29 Packing Device Capped w/Cement 335.00 349.00 0
1987-08-19 Acid Treatment 3822.00 3858.00 0
2006-06-09 Perforation 3859.00 3865.00 13
2006-06-11 Perforation 3854.00 3859.00 13
2006-06-11 Perforation 3849.00 3854.00 13
2006-06-12 Perforation 3836.00 3842.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 121 0.0 0.0 0.0
1984 3336 0.0 0.0 0.0
1985 8562 0.0 0.0 0.0
1986 8033 0.0 0.0 0.0
1987 4496 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 3666 0.0 0.0 0.0
1996 7139 0.0 0.0 0.0
1997 7957 0.0 0.0 0.0
1998 8616 0.0 0.0 0.0
1999 8538 0.0 0.0 0.0
2000 7658 0.0 0.0 0.0
2001 8441 0.0 0.0 0.0
2002 8535 0.0 0.0 0.0
2003 7991 0.0 0.0 0.0
2004 8540 0.0 0.0 0.0
2005 8606 0.0 0.0 0.0
2006 5601 0.0 0.0 0.0
2007 6620 0.0 0.0 0.0
2008 8278 0.0 0.0 0.0
2009 4733 0.0 0.0 0.0
2010 1401 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1981-02-01 Lost Circulation 3439.00 3439.00
1981-03-01 Kick 3600.00 3600.00
2012-10-10 No Incident Encountered 0.00 0.00

For data sources see[7]

References