If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0475132714000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.086986,"lon":-115.819499,"icon":""}]} |
Location: 00/14-27-047-13W5/0 | |
Location Alias: 00/14-27-47-13 W5M | |
Location Alias 2: 00/14-27-047-13 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 5 | |
Range: 13 | |
Section: 27 | |
County/Municipality: Yellowhead County | |
Well Name: VERMILION BRAZR 14-27-47-13 | |
Operator Name: Vermilion Energy Inc. | |
License Number: 0144755 | |
License Date: 1990-07-11 | |
License Status: Abandoned | |
Spud Date: 1990-08-11 | |
Final Drill Date: 1990-11-03 | |
Well Total Depth: 3450.00 m | |
Surface Hole Latitude: 53.086986 | |
Surface Hole Longitude: -115.819499 |
Date | Event |
---|---|
1990-07-11 | Obtained License |
1990-08-14 | Surface Casing Operation Performed |
1990-10-01 | Well Log Performed |
1990-10-18 | Intermediate Casing Operation Performed |
1990-10-28 | Well Log Performed |
1990-11-03 | Finished Drilling |
1990-11-03 | Well Mode changed to Drilled and Cased |
1990-11-04 | Well Log Performed |
1990-11-06 | Well Log Performed |
1990-11-07 | Well Log Performed |
1990-11-10 | Liner Casing Operation Performed |
1990-11-11 | Rig Released |
1990-11-28 | Perforation Treatment Performed - Jet Perforation |
1990-11-28 | Well Log Performed |
1990-11-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-11-30 | Well Log Performed |
1990-12-01 | Well Began Production |
1990-12-01 | Well Fluid changed to Crude Oil |
1990-12-01 | Well Mode changed to Pumping |
1991-01-01 | Well Fluid changed to Crude Oil |
1991-01-01 | Well Mode changed to Suspended |
1994-09-01 | Well Fluid changed to Gas |
1994-09-01 | Well Mode changed to Flowing |
1996-10-26 | Well Log Performed |
1997-01-23 | Well Log Performed |
1997-02-28 | Well Log Performed |
1998-06-09 | Well Log Performed |
1998-06-13 | Well Log Performed |
1998-07-10 | Well Log Performed |
1998-07-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-07-15 | Perforation Treatment Performed - Jet Perforation |
1998-07-15 | Well Log Performed |
1998-07-22 | Perforation Treatment Performed - Acid Wash - No Pressure |
1998-10-31 | Well Fluid changed to Gas |
1998-10-31 | Well Mode changed to Suspended |
2000-07-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-07-22 | Plug Back Performed |
2000-07-22 | Well Fluid changed to Gas |
2000-07-22 | Well Mode changed to Abandoned and Whipstocked |
2000-07-23 | Well Log Performed |
2000-07-24 | Perforation Treatment Performed - Bridge Plug No Cement Required |
2012-11-05 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1990-11-28 | Perforation | 3331.00 | 3341.00 | 13 |
1990-11-28 | Perforation | 3346.00 | 3348.00 | 13 |
1990-11-28 | Perforation | 3350.00 | 3352.00 | 13 |
1990-11-30 | Acid Treatment | 3331.00 | 3352.00 | 0 |
1998-07-15 | Packing Device Capped w/Cement | 3343.70 | 3344.50 | 0 |
1998-07-15 | Perforation | 3335.00 | 3341.00 | 17 |
1998-07-22 | Acid Wash | 3335.00 | 3341.00 | 0 |
2000-07-22 | Packing Device Capped w/Cement | 3315.00 | 3323.00 | 0 |
2000-07-24 | Bridge Plug, No Cement | 2828.80 | 2829.30 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1990 | 400 | 0.0 | 0.0 | 0.0 |
1994 | 2466 | 0.0 | 0.0 | 0.0 |
1995 | 5283 | 0.0 | 0.0 | 0.0 |
1996 | 7477 | 0.0 | 0.0 | 0.0 |
1997 | 8333 | 0.0 | 0.0 | 0.0 |
1998 | 3635 | 0.0 | 0.0 | 0.0 |
For data sources see[5]