If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0475131904000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.064814,"lon":-115.902604,"icon":""}]} |
Location: 00/04-19-047-13W5/0 | |
Location Alias: 00/04-19-47-13 W5M | |
Location Alias 2: 00/04-19-047-13 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 5 | |
Range: 13 | |
Section: 19 | |
County/Municipality: Yellowhead County | |
Well Name: CVE BRAZR 4-19-47-13 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0198931 | |
License Date: 1997-03-04 | |
License Status: Issued | |
Spud Date: 1997-04-24 | |
Final Drill Date: 1997-05-28 | |
Well Total Depth: 3154.00 m | |
Surface Hole Latitude: 53.064814 | |
Surface Hole Longitude: -115.902604 |
Date | Event |
---|---|
1997-03-04 | Obtained License |
1997-04-28 | Surface Casing Operation Performed |
1997-05-02 | Water Flow Occurred |
1997-05-12 | Direction Drilling Operation Performed - Deviate |
1997-05-28 | Finished Drilling |
1997-05-28 | Well Mode changed to Drilled and Cased |
1997-05-30 | Well Log Performed |
1997-06-01 | Production Casing Operation Performed |
1997-06-01 | Rig Released |
1997-06-06 | Well Log Performed |
1997-06-09 | Well Log Performed |
1997-06-10 | Perforation Treatment Performed - Jet Perforation |
1997-06-10 | Well Log Performed |
1997-06-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-06-28 | Perforation Treatment Performed - Jet Perforation |
1997-06-28 | Well Log Performed |
1997-06-30 | Perforation Treatment Performed - Fractured |
1997-07-08 | Perforation Treatment Performed - Cement Squeeze |
1997-07-08 | Plug Back Performed |
1997-07-15 | Perforation Treatment Performed - Jet Perforation |
1997-09-09 | Well Began Production |
1997-09-09 | Well Fluid changed to Gas |
1997-09-09 | Well Mode changed to Flowing |
2000-06-29 | Well Fluid changed to Gas |
2000-06-29 | Well Mode changed to Flowing |
2001-03-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-03-20 | Plug Back Performed |
2001-03-20 | Well Fluid changed to Gas |
2001-03-20 | Well Mode changed to Abandoned Zone |
2001-03-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-03-21 | Perforation Treatment Performed - Jet Perforation |
2001-03-21 | Plug Back Performed |
2001-03-21 | Well Log Performed |
2001-03-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2001-03-23 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1997-05-12 | 2286.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1997-06-10 | Perforation | 3099.00 | 3102.00 | 17 |
2001-03-20 | Packing Device Capped w/Cement | 3082.00 | 3090.00 | 0 |
2001-03-21 | Packing Device Capped w/Cement | 2969.00 | 2977.00 | 0 |
2001-03-21 | Perforation | 1781.00 | 1787.00 | 20 |
2001-03-23 | Acid Treatment | 1781.00 | 1787.00 | 0 |
2001-03-23 | Fracture | 1781.00 | 1787.00 | 0 |
1997-06-10 | Perforation | 3106.50 | 3107.50 | 17 |
1997-06-10 | Perforation | 3110.00 | 3115.00 | 17 |
1997-06-17 | Acid Treatment | 3099.00 | 3115.00 | 0 |
1997-06-28 | Perforation | 3012.00 | 3016.00 | 17 |
1997-06-28 | Perforation | 3033.50 | 3038.00 | 17 |
1997-06-30 | Fracture | 3099.00 | 3115.00 | 0 |
1997-07-08 | Cement Squeeze | 3012.00 | 3038.00 | 0 |
1997-07-15 | Perforation | 2984.00 | 2986.50 | 17 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1997 | 2258 | 0.0 | 0.0 | 0.0 |
1998 | 8489 | 0.0 | 0.0 | 0.0 |
1999 | 5852 | 0.0 | 0.0 | 0.0 |
2000 | 35 | 0.0 | 0.0 | 0.0 |
2001 | 69 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1997-05-02 | Water Flow | 1261.00 | 1261.00 |
For data sources see[7]