If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0475113206020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.091727,"lon":-115.578485,"icon":""}]} |
Location: 02/06-32-047-11W5/0 | |
Location Alias: 02/06-32-47-11 W5M | |
Location Alias 2: 02/06-32-047-11 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 5 | |
Range: 11 | |
Section: 32 | |
County/Municipality: Brazeau County | |
Well Name: SINOPEC BRAZR 6-32-47-11 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0078475 | |
License Date: 1979-10-05 | |
License Status: Suspension | |
Spud Date: 1979-10-25 | |
Final Drill Date: 1979-12-19 | |
Well Total Depth: 3187.00 m | |
Surface Hole Latitude: 53.091727 | |
Surface Hole Longitude: -115.578485 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1979-10-05 | Obtained License |
1979-10-25 | Direction Drilling Operation Performed - 98 |
1979-12-04 | Well Log Performed |
1979-12-06 | Drill Stem Test Performed |
1979-12-08 | Production Casing Operation Performed |
1979-12-19 | Finished Drilling |
1979-12-21 | Well Log Performed |
1979-12-23 | Well Mode changed to Drilled and Cased |
1981-12-03 | Perforation Treatment Performed - Jet Perforation |
2001-01-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-01-11 | Plug Back Performed |
2001-01-11 | Well Mode changed to Abandoned Zone |
2006-02-03 | Perforation Treatment Performed - Jet Perforation |
2006-07-06 | Well Began Production |
2006-07-06 | Well Fluid changed to Gas |
2006-07-06 | Well Mode changed to Flowing |
2011-06-01 | Well Fluid changed to Gas |
2011-06-01 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1979-10-25 | 1910.00 | Conversion |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1981-12-03 | Perforation | 2454.50 | 2463.00 | 13 |
2001-01-11 | Packing Device Capped w/Cement | 2442.00 | 2450.00 | 0 |
2006-02-03 | Perforation | 2454.50 | 2463.00 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 4176 | 0.0 | 0.0 | 0.0 |
2007 | 3062 | 0.0 | 0.0 | 0.0 |
For data sources see[6]