If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0475113115000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.085887,"lon":-115.592925,"icon":""}]} |
Location: 00/15-31-047-11W5/0 | |
Location Alias: 00/15-31-47-11 W5M | |
Location Alias 2: 00/15-31-047-11 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 5 | |
Range: 11 | |
Section: 31 | |
County/Municipality: Brazeau County | |
Well Name: SDEL HZ BRAZR 15-31-47-11 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0446915 | |
License Date: 2012-06-27 | |
License Status: Issued | |
Spud Date: 2012-07-07 | |
Final Drill Date: 2012-07-23 | |
Well Total Depth: 4306.00 m | |
Surface Hole Latitude: 53.085887 | |
Surface Hole Longitude: -115.592925 |
Date | Event |
---|---|
2012-06-27 | Obtained License |
2012-07-09 | Surface Casing Operation Performed |
2012-07-12 | Direction Drilling Operation Performed - Deviate |
2012-07-13 | Well Log Performed |
2012-07-15 | Direction Drilling Operation Performed - Horizontal |
2012-07-15 | Well Log Performed |
2012-07-22 | Well Log Performed |
2012-07-23 | Finished Drilling |
2012-07-23 | Well Mode changed to Drilled and Cased |
2012-07-28 | Production Casing Operation Performed |
2012-07-28 | Rig Released |
2012-08-03 | Well Log Performed |
2012-08-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-06 | Perforation Treatment Performed - Open-Hole Completion |
2012-08-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-09-15 | Well Began Production |
2012-09-15 | Well Fluid changed to Gas |
2012-09-15 | Well Mode changed to Flowing |
2014-02-01 | Well Fluid changed to Gas |
2014-02-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-07-07 | Nabors Drilling Limited | 26 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-07-12 | 2110.00 | Deviate (5 - 79 degrees) |
2012-07-15 | 2681.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-08-06 | Open Hole/Barefoot Completion | 4303.50 | 4306.00 | 0 |
2012-08-06 | Multi-Stage Fracture | 3470.10 | 3470.20 | 0 |
2012-08-06 | Multi-Stage Fracture | 3377.90 | 3378.00 | 0 |
2012-08-06 | Multi-Stage Fracture | 3279.50 | 3279.60 | 0 |
2012-08-07 | Multi-Stage Fracture | 3179.40 | 3179.50 | 0 |
2012-08-07 | Multi-Stage Fracture | 3079.50 | 3079.60 | 0 |
2012-08-07 | Multi-Stage Fracture | 2987.60 | 2987.70 | 0 |
2012-08-07 | Multi-Stage Fracture | 2902.90 | 2903.00 | 0 |
2012-08-07 | Multi-Stage Fracture | 2790.60 | 2790.70 | 0 |
2012-08-06 | Multi-Stage Fracture | 4253.80 | 4253.90 | 0 |
2012-08-06 | Multi-Stage Fracture | 4163.80 | 4163.90 | 0 |
2012-08-06 | Multi-Stage Fracture | 4069.10 | 4069.20 | 0 |
2012-08-06 | Multi-Stage Fracture | 3960.30 | 3960.40 | 0 |
2012-08-06 | Multi-Stage Fracture | 3867.80 | 3867.90 | 0 |
2012-08-06 | Multi-Stage Fracture | 3773.30 | 3773.40 | 0 |
2012-08-06 | Multi-Stage Fracture | 3671.30 | 3671.40 | 0 |
2012-08-06 | Multi-Stage Fracture | 3574.00 | 3574.10 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 2453 | 0.0 | 0.0 | 0.0 |
2013 | 7298 | 0.0 | 0.0 | 0.0 |
2014 | 6714 | 0.0 | 0.0 | 0.0 |
2015 | 7749 | 0.0 | 0.0 | 0.0 |
2016 | 6587 | 0.0 | 0.0 | 0.0 |
2017 | 6621 | 0.0 | 0.0 | 0.0 |
2018 | 6752 | 0.0 | 0.0 | 0.0 |
2019 | 1934 | 0.0 | 0.0 | 0.0 |
2020 | 2039 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-07-28 | No Incident Encountered | 0.00 | 0.00 |
2012-08-21 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]