If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0475110605000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.021933,"lon":-115.584335,"icon":""}]} |
| Location: 00/05-06-047-11W5/0 | |
| Location Alias: 00/05-06-47-11 W5M | |
| Location Alias 2: 00/05-06-047-11 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 047 | |
| Meridian: 5 | |
| Range: 11 | |
| Section: 06 | |
| County/Municipality: Brazeau County | |
| Well Name: SDEL HZ BRAZR 5-6-47-11 | |
| Operator Name: Sinopec Daylight Energy Ltd. | |
| License Number: 0442817 | |
| License Date: 2012-01-13 | |
| License Status: Issued | |
| Spud Date: 2012-01-14 | |
| Final Drill Date: 2012-01-25 | |
| Well Total Depth: 3590.00 m | |
| Surface Hole Latitude: 53.021933 | |
| Surface Hole Longitude: -115.584335 |
| Date | Event |
|---|---|
| 2012-01-13 | Obtained License |
| 2012-01-14 | Well Log Performed |
| 2012-01-15 | Lost Circulation Occurred |
| 2012-01-16 | Surface Casing Operation Performed |
| 2012-01-17 | Direction Drilling Operation Performed - Horizontal |
| 2012-01-25 | Finished Drilling |
| 2012-01-25 | Well Log Performed |
| 2012-01-25 | Well Mode changed to Drilled and Cased |
| 2012-01-27 | Intermediate Casing Operation Performed |
| 2012-01-27 | Liner Casing Operation Performed |
| 2012-01-28 | Rig Released |
| 2012-02-06 | Well Log Performed |
| 2012-02-21 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-02-21 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-02-22 | Well Began Production |
| 2012-02-22 | Well Fluid changed to Crude Oil |
| 2012-02-22 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-01-14 | Nabors Drilling Limited | 26 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-01-17 | 1581.00 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-02-21 | Open Hole/Barefoot Completion | 3583.00 | 3590.00 | 0 |
| 2012-02-21 | Multi-Stage Fracture | 2973.60 | 2973.70 | 0 |
| 2012-02-21 | Multi-Stage Fracture | 2901.20 | 2901.30 | 0 |
| 2012-02-21 | Multi-Stage Fracture | 2828.90 | 2829.00 | 0 |
| 2012-02-21 | Multi-Stage Fracture | 2757.20 | 2757.30 | 0 |
| 2012-02-21 | Multi-Stage Fracture | 2684.10 | 2684.20 | 0 |
| 2012-02-21 | Multi-Stage Fracture | 2612.10 | 2612.20 | 0 |
| 2012-02-21 | Multi-Stage Fracture | 2539.30 | 2539.40 | 0 |
| 2012-02-21 | Multi-Stage Fracture | 2478.00 | 2478.10 | 0 |
| 2012-02-21 | Multi-Stage Fracture | 2405.60 | 2405.70 | 0 |
| 2012-02-21 | Multi-Stage Fracture | 2332.50 | 2332.60 | 0 |
| 2012-02-21 | Multi-Stage Fracture | 3549.50 | 3549.60 | 0 |
| 2012-02-21 | Multi-Stage Fracture | 2259.90 | 2260.00 | 0 |
| 2012-02-21 | Multi-Stage Fracture | 3481.30 | 3481.40 | 0 |
| 2012-02-21 | Multi-Stage Fracture | 3409.10 | 3409.20 | 0 |
| 2012-02-21 | Multi-Stage Fracture | 3336.00 | 3336.10 | 0 |
| 2012-02-21 | Multi-Stage Fracture | 3264.00 | 3264.10 | 0 |
| 2012-02-21 | Multi-Stage Fracture | 3190.80 | 3190.90 | 0 |
| 2012-02-21 | Multi-Stage Fracture | 3118.40 | 3118.50 | 0 |
| 2012-02-21 | Multi-Stage Fracture | 3046.00 | 3046.10 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 6653 | 0.0 | 0.0 | 0.0 |
| 2013 | 8470 | 0.0 | 0.0 | 0.0 |
| 2014 | 8633 | 0.0 | 0.0 | 0.0 |
| 2015 | 8631 | 0.0 | 0.0 | 0.0 |
| 2016 | 6287 | 0.0 | 0.0 | 0.0 |
| 2017 | 8574 | 0.0 | 0.0 | 0.0 |
| 2018 | 8443 | 0.0 | 0.0 | 0.0 |
| 2019 | 8582 | 0.0 | 0.0 | 0.0 |
| 2020 | 2039 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-01-15 | Lost Circulation | 599.00 | 599.00 |
For data sources see[8]