X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475110605000

Well Details

Well ID: 0475110605000
Loading map...
Location: 00/05-06-047-11W5/0
Location Alias: 00/05-06-47-11 W5M
Location Alias 2: 00/05-06-047-11 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 11
Section: 06
County/Municipality: Brazeau County
Well Name: SDEL HZ BRAZR 5-6-47-11
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0442817
License Date: 2012-01-13
License Status: Issued
Spud Date: 2012-01-14
Final Drill Date: 2012-01-25
Well Total Depth: 3590.00 m
Surface Hole Latitude: 53.021933
Surface Hole Longitude: -115.584335

For data sources see[1][2]

Well History

Date Event
2012-01-13 Obtained License
2012-01-14 Well Log Performed
2012-01-15 Lost Circulation Occurred
2012-01-16 Surface Casing Operation Performed
2012-01-17 Direction Drilling Operation Performed - Horizontal
2012-01-25 Finished Drilling
2012-01-25 Well Log Performed
2012-01-25 Well Mode changed to Drilled and Cased
2012-01-27 Intermediate Casing Operation Performed
2012-01-27 Liner Casing Operation Performed
2012-01-28 Rig Released
2012-02-06 Well Log Performed
2012-02-21 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-21 Perforation Treatment Performed - Open-Hole Completion
2012-02-22 Well Began Production
2012-02-22 Well Fluid changed to Crude Oil
2012-02-22 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-14 Nabors Drilling Limited 26 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-01-17 1581.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-21 Open Hole/Barefoot Completion 3583.00 3590.00 0
2012-02-21 Multi-Stage Fracture 2973.60 2973.70 0
2012-02-21 Multi-Stage Fracture 2901.20 2901.30 0
2012-02-21 Multi-Stage Fracture 2828.90 2829.00 0
2012-02-21 Multi-Stage Fracture 2757.20 2757.30 0
2012-02-21 Multi-Stage Fracture 2684.10 2684.20 0
2012-02-21 Multi-Stage Fracture 2612.10 2612.20 0
2012-02-21 Multi-Stage Fracture 2539.30 2539.40 0
2012-02-21 Multi-Stage Fracture 2478.00 2478.10 0
2012-02-21 Multi-Stage Fracture 2405.60 2405.70 0
2012-02-21 Multi-Stage Fracture 2332.50 2332.60 0
2012-02-21 Multi-Stage Fracture 3549.50 3549.60 0
2012-02-21 Multi-Stage Fracture 2259.90 2260.00 0
2012-02-21 Multi-Stage Fracture 3481.30 3481.40 0
2012-02-21 Multi-Stage Fracture 3409.10 3409.20 0
2012-02-21 Multi-Stage Fracture 3336.00 3336.10 0
2012-02-21 Multi-Stage Fracture 3264.00 3264.10 0
2012-02-21 Multi-Stage Fracture 3190.80 3190.90 0
2012-02-21 Multi-Stage Fracture 3118.40 3118.50 0
2012-02-21 Multi-Stage Fracture 3046.00 3046.10 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6653 0.0 0.0 0.0
2013 8470 0.0 0.0 0.0
2014 8633 0.0 0.0 0.0
2015 8631 0.0 0.0 0.0
2016 6287 0.0 0.0 0.0
2017 8574 0.0 0.0 0.0
2018 8443 0.0 0.0 0.0
2019 8582 0.0 0.0 0.0
2020 2039 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-01-15 Lost Circulation 599.00 599.00

For data sources see[8]

References