X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475102416000

Well Details

Well ID: 0475102416000
Loading map...
Location: 00/16-24-047-10W5/0
Location Alias: 00/16-24-47-10 W5M
Location Alias 2: 00/16-24-047-10 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 10
Section: 24
County/Municipality: Brazeau County
Well Name: PAN AM HB BR B-16 PEM 16-24-47-10
Operator Name: Obsidian Energy Ltd.
License Number: 0015958
License Date: 1958-09-25
License Status: Issued
Spud Date: 1958-10-05
Final Drill Date: 1958-10-17
Well Total Depth: 1819.70 m
Surface Hole Latitude: 53.074115
Surface Hole Longitude: -115.321258

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-09-25 Obtained License
1958-10-17 Finished Drilling
1958-10-17 Well Mode changed to Drilled and Cased
1958-10-19 Production Casing Operation Performed
1958-10-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-10-23 Perforation Treatment Performed - Fractured
1958-10-23 Perforation Treatment Performed - Jet Perforation
1958-11-06 Well Began Production
1958-11-06 Well Fluid changed to Crude Oil
1958-11-06 Well Mode changed to Flowing
1962-07-04 Well Began Injection
1962-07-04 Well Fluid changed to Gas
1962-07-04 Well Type changed to Injection
1967-05-02 Well Fluid changed to Water
1967-05-02 Well Type changed to Injection
1970-07-27 Perforation Treatment Performed - Cement Squeeze
1970-08-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-08-04 Perforation Treatment Performed - Jet Perforation
1976-04-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-06-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-12-21 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-10-23 Perforation 1779.10 1785.20 13
2002-12-21 Perforation 1777.70 1785.00 17
1958-10-23 Acid Treatment 1779.10 1785.20 0
1958-10-23 Fracture 1779.10 1785.20 0
1970-07-27 Cement Squeeze 1779.10 1785.20 0
1970-08-04 Perforation 1777.60 1779.40 7
1970-08-04 Perforation 1780.60 1782.50 7
1970-08-04 Acid Treatment 1777.60 1782.50 0
1976-04-02 Acid Treatment 1777.60 1782.50 0
1978-06-12 Acid Treatment 1777.60 1782.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References