X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475102110000

Well Details

Well ID: 0475102110000
Loading map...
Location: 00/10-21-047-10W5/0
Location Alias: 00/10-21-47-10 W5M
Location Alias 2: 00/10-21-047-10 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 10
Section: 21
County/Municipality: Brazeau County
Well Name: NCE ENER ET AL PEMBINA 10-21-47-10
Operator Name: Obsidian Energy Ltd.
License Number: 0068833
License Date: 1978-03-16
License Status: Suspension
Spud Date: 1978-03-21
Final Drill Date: 1978-05-06
Well Total Depth: 3034.30 m
Surface Hole Latitude: 53.071700
Surface Hole Longitude: -115.398505

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-03-16 Obtained License
1978-04-29 Production Casing Operation Performed
1978-05-06 Finished Drilling
1978-05-06 Well Mode changed to Drilled and Cased
1978-07-08 Perforation Treatment Performed - Jet Perforation
1978-07-09 Perforation Treatment Performed - Jet Perforation
1978-07-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-07-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-07-15 Perforation Treatment Performed - Fractured
1978-09-26 Well Began Production
1978-09-26 Well Fluid changed to Crude Oil
1978-09-26 Well Mode changed to Pumping
1986-08-23 Perforation Treatment Performed - Jet Perforation
1986-08-23 Well Log Performed
1986-08-24 Perforation Treatment Performed - Fractured
1993-04-30 Well Fluid changed to Crude Oil
1993-04-30 Well Mode changed to Suspended
1993-05-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-07-08 Perforation 1861.70 1863.20 13
1978-07-09 Perforation 1842.80 1843.40 13
1978-07-09 Perforation 1833.40 1835.50 13
1978-07-10 Packing Device Capped w/Cement 1851.90 1859.90 0
1978-07-14 Acid Treatment 1833.40 1863.20 0
1978-07-15 Fracture 1833.40 1863.20 0
1986-08-23 Perforation 1833.00 1835.80 13
1986-08-24 Fracture 1833.00 1843.40 0
1993-05-15 Packing Device Capped w/Cement 1822.00 1830.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 1297 0.0 0.0 0.0
1979 8567 0.0 0.0 0.0
1980 7555 0.0 0.0 0.0
1981 7906 0.0 0.0 0.0
1982 7849 0.0 0.0 0.0
1983 8624 0.0 0.0 0.0
1984 6743 0.0 0.0 0.0
1985 7834 0.0 0.0 0.0
1986 4266 0.0 0.0 0.0
1987 7318 0.0 0.0 0.0
1988 8436 0.0 0.0 0.0
1989 8423 0.0 0.0 0.0
1990 8615 0.0 0.0 0.0
1991 8471 0.0 0.0 0.0
1992 6815 0.0 0.0 0.0

For data sources see[5]

References