X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475093216020

Well Details

Well ID: 0475093216020
Loading map...
Location: 02/16-32-047-09W5/0
Location Alias: 02/16-32-47-09 W5M
Location Alias 2: 02/16-32-047-09 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 09
Section: 32
County/Municipality: Brazeau County
Well Name: DAYLIGHT PEMBINA 16-32-47-9
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0355076
License Date: 2006-04-04
License Status: Issued
Spud Date: 2006-08-10
Final Drill Date: 2006-08-29
Well Total Depth: 2860.00 m
Surface Hole Latitude: 53.103289
Surface Hole Longitude: -115.274282

For data sources see[1][2]

Well History

Date Event
2006-04-04 Obtained License
2006-08-12 Surface Casing Operation Performed
2006-08-14 Direction Drilling Operation Performed - Deviate
2006-08-26 Well Log Performed
2006-08-29 Finished Drilling
2006-08-29 Intermediate Casing Operation Performed
2006-08-29 Well Log Performed
2006-08-29 Well Mode changed to Drilled and Cased
2006-08-30 Liner Casing Operation Performed
2006-08-31 Rig Released
2006-10-30 Perforation Treatment Performed - Jet Perforation
2006-10-31 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-11-09 Well Began Production
2006-11-09 Well Fluid changed to Crude Oil
2006-11-09 Well Mode changed to Flowing
2009-02-02 Perforation Treatment Performed - Casing Patch (Over Perfs)
2009-02-05 Perforation Treatment Performed - Jet Perforation
2009-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2016-04-01 Well Fluid changed to Crude Oil
2016-04-01 Well Mode changed to Suspended
2016-12-19 Well Fluid changed to Crude Oil
2016-12-19 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2006-08-14 721.40 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-10-30 Perforation 2777.00 2784.60 17
2006-10-31 Acid Treatment 2777.00 2784.60 0
2009-02-02 Casing Patch 2777.00 2784.60 0
2009-02-05 Perforation 2783.00 2790.00 20
2009-02-06 Acid Treatment 2783.00 2790.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 300 0.0 0.0 0.0
2007 2596 0.0 0.0 0.0
2008 7351 0.0 0.0 0.0
2009 8054 0.0 0.0 0.0
2010 8177 0.0 0.0 0.0
2011 8267 0.0 0.0 0.0
2012 6366 0.0 0.0 0.0
2013 8565 0.0 0.0 0.0
2014 8738 0.0 0.0 0.0
2015 1566 0.0 0.0 0.0
2016 300 0.0 0.0 0.0
2017 7596 0.0 0.0 0.0
2018 7653 0.0 0.0 0.0
2019 8484 0.0 0.0 0.0
2020 1855 0.0 0.0 0.0

For data sources see[6]

References