X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475092910000

Well Details

Well ID: 0475092910000
Loading map...
Location: 00/10-29-047-09W5/0
Location Alias: 00/10-29-47-09 W5M
Location Alias 2: 00/10-29-047-09 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 09
Section: 29
County/Municipality: Brazeau County
Well Name: MARATHON PEMBINA 10-29-47-9
Operator Name: Obsidian Energy Ltd.
License Number: 0015752
License Date: 1958-08-17
License Status: Suspension
Spud Date: 1958-08-20
Final Drill Date: 1958-08-30
Well Total Depth: 1741.30 m
Surface Hole Latitude: 53.085142
Surface Hole Longitude: -115.278501

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-08-17 Obtained License
1958-08-30 Finished Drilling
1958-08-30 Production Casing Operation Performed
1958-08-30 Well Mode changed to Drilled and Cased
1958-09-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-09-05 Perforation Treatment Performed - Fractured
1958-09-05 Perforation Treatment Performed - Jet Perforation
1958-10-03 Well Began Production
1958-10-03 Well Fluid changed to Crude Oil
1958-10-03 Well Mode changed to Flowing
1963-12-21 Well Fluid changed to Crude Oil
1963-12-21 Well Mode changed to Pumping
1971-01-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-01-25 Perforation Treatment Performed - Fractured
1977-11-28 Perforation Treatment Performed - Fractured
2001-06-01 Well Fluid changed to Crude Oil
2001-06-01 Well Mode changed to Suspended
2011-07-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-07-29 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-09-05 Perforation 1702.90 1707.20 13
1958-09-05 Perforation 1708.40 1711.80 13
1958-09-05 Acid Treatment 1702.90 1711.80 0
1958-09-05 Fracture 1702.90 1711.80 0
1971-01-25 Acid Treatment 1702.90 1711.80 0
1971-01-25 Fracture 1702.90 1711.80 0
1977-11-28 Fracture 1702.90 1711.80 0
2011-07-27 Packing Device Capped w/Cement 1689.00 1697.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8328 0.0 0.0 0.0
1968 8520 0.0 0.0 0.0
1969 7992 0.0 0.0 0.0
1970 8424 0.0 0.0 0.0
1971 8039 0.0 0.0 0.0
1972 8663 0.0 0.0 0.0
1973 8615 0.0 0.0 0.0
1974 8544 0.0 0.0 0.0
1975 8448 0.0 0.0 0.0
1976 8760 0.0 0.0 0.0
1977 8279 0.0 0.0 0.0
1978 8447 0.0 0.0 0.0
1979 8759 0.0 0.0 0.0
1980 8376 0.0 0.0 0.0
1981 8519 0.0 0.0 0.0
1982 8640 0.0 0.0 0.0
1983 8471 0.0 0.0 0.0
1984 8687 0.0 0.0 0.0
1985 8303 0.0 0.0 0.0
1986 7943 0.0 0.0 0.0
1987 7564 0.0 0.0 0.0
1988 8689 0.0 0.0 0.0
1989 8111 0.0 0.0 0.0
1990 8615 0.0 0.0 0.0
1991 8223 0.0 0.0 0.0
1992 8426 0.0 0.0 0.0
1993 7439 0.0 0.0 0.0
1994 8135 0.0 0.0 0.0
1995 8411 0.0 0.0 0.0
1996 8640 0.0 0.0 0.0
1997 8280 0.0 0.0 0.0
1998 7583 0.0 0.0 0.0
2000 6900 0.0 0.0 0.0
2001 1008 0.0 0.0 0.0

For data sources see[5]

References