X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475091806000

Well Details

Well ID: 0475091806000
Loading map...
Location: 00/06-18-047-09W5/0
Location Alias: 00/06-18-47-09 W5M
Location Alias 2: 00/06-18-047-09 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 09
Section: 18
County/Municipality: Brazeau County
Well Name: PAN AM HB BR B-12 PEM 6-18-47-9
Operator Name: Obsidian Energy Ltd.
License Number: 0022344
License Date: 1962-04-25
License Status: Issued
Spud Date: 1962-05-25
Final Drill Date: 1962-06-17
Well Total Depth: 2433.80 m
Surface Hole Latitude: 53.052414
Surface Hole Longitude: -115.308906

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-04-25 Obtained License
1962-06-17 Finished Drilling
1962-06-17 Well Mode changed to Drilled and Cased
1962-06-18 Drill Stem Test Performed
1962-06-19 Production Casing Operation Performed
1962-06-25 Perforation Treatment Performed - Abrasa-Jet Perforation
1962-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-06-25 Perforation Treatment Performed - Fractured
1962-07-09 Well Began Production
1962-07-09 Well Fluid changed to Crude Oil
1962-07-09 Well Mode changed to Flowing
1962-12-01 Well Fluid changed to Crude Oil
1962-12-01 Well Mode changed to Pumping
1975-09-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-10-27 Well Began Injection
1975-10-27 Well Fluid changed to Water
1975-10-27 Well Type changed to Injection
1976-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-10-06 Perforation Treatment Performed - Jet Perforation
1979-03-05 Perforation Treatment Performed - Fractured
1988-02-17 Well Log Performed
1988-02-18 Well Log Performed
1988-02-19 Perforation Treatment Performed - Jet Perforation
1988-02-20 Perforation Treatment Performed - Remedial Casing
1988-02-20 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-06-25 Hydra Jet Perforation 1774.50 1774.50 0
1988-02-20 Remedial Casing Cementing 510.00 510.60 0
1962-06-25 Acid Treatment 1774.50 1774.50 0
1962-06-25 Fracture 1774.50 1774.50 0
1975-09-19 Acid Treatment 1774.50 1774.50 0
1976-10-06 Perforation 1768.70 1770.20 7
1976-10-06 Perforation 1772.70 1776.90 7
1976-10-06 Acid Treatment 1768.70 1776.90 0
1979-03-05 Fracture 1768.70 1776.90 0
1988-02-19 Perforation 510.00 510.60 8

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8495 0.0 0.0 0.0
1968 8639 0.0 0.0 0.0
1969 4104 0.0 0.0 0.0
1970 8087 0.0 0.0 0.0
1971 8639 0.0 0.0 0.0
1972 4482 0.0 0.0 0.0
1973 2256 0.0 0.0 0.0
1974 1944 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References