X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475091502000

Well Details

Well ID: 0475091502000
Loading map...
Location: 00/02-15-047-09W5/0
Location Alias: 00/02-15-47-09 W5M
Location Alias 2: 00/02-15-047-09 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 09
Section: 15
County/Municipality: Brazeau County
Well Name: MARATHON PEMBINA 2-15-47-9
Operator Name: Obsidian Energy Ltd.
License Number: 0014617
License Date: 1958-01-20
License Status: Issued
Spud Date: 1958-01-21
Final Drill Date: 1958-01-31
Well Total Depth: 1709.90 m
Surface Hole Latitude: 53.048823
Surface Hole Longitude: -115.229691

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-01-02 Perforation Treatment Performed - Acid Wash - No Pressure
1958-01-02 Perforation Treatment Performed - Fractured
1958-01-02 Perforation Treatment Performed - Jet Perforation
1958-01-20 Obtained License
1958-01-31 Finished Drilling
1958-01-31 Well Mode changed to Drilled and Cased
1958-02-01 Production Casing Operation Performed
1958-02-10 Perforation Treatment Performed - Acid Wash - No Pressure
1958-02-10 Perforation Treatment Performed - Fractured
1958-02-10 Perforation Treatment Performed - Jet Perforation
1958-02-14 Well Began Production
1958-02-14 Well Fluid changed to Crude Oil
1958-02-14 Well Mode changed to Flowing
1970-08-10 Well Began Injection
1970-08-10 Well Fluid changed to Water
1970-08-10 Well Type changed to Injection
1972-06-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-05-01 Well Fluid changed to Water
2013-05-01 Well Mode changed to Suspended
2013-05-01 Well Type changed to Injection
2017-05-01 Well Fluid changed to Water
2017-05-01 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-01-02 Perforation 1680.70 1684.60 13
1958-01-02 Acid Wash 1680.70 1684.60 0
1958-01-02 Fracture 1680.70 1684.60 0
1958-02-10 Perforation 1674.90 1677.30 13
1958-02-10 Acid Wash 1674.90 1684.60 0
1958-02-10 Fracture 1674.90 1684.60 0
1972-06-05 Acid Treatment 1674.90 1683.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8063 0.0 0.0 0.0
1968 6527 0.0 0.0 0.0
1969 7559 0.0 0.0 0.0
1970 216 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References