X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475082013000

Well Details

Well ID: 0475082013000
Loading map...
Location: 00/13-20-047-08W5/0
Location Alias: 00/13-20-47-08 W5M
Location Alias 2: 00/13-20-047-08 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 08
Section: 20
County/Municipality: Brazeau County
Well Name: AMOCO HB PEMBINA 13-20-47-8
Operator Name: Obsidian Energy Ltd.
License Number: 0113702
License Date: 1985-03-01
License Status: Suspension
Spud Date: 1985-03-03
Final Drill Date: 1985-03-17
Well Total Depth: 2248.50 m
Surface Hole Latitude: 53.074459
Surface Hole Longitude: -115.144284

For data sources see[1][2]

Well History

Date Event
1985-03-01 Obtained License
1985-03-04 Surface Casing Operation Performed
1985-03-17 Finished Drilling
1985-03-17 Well Mode changed to Drilled and Cased
1985-03-18 Well Log Performed
1985-03-20 Production Casing Operation Performed
1985-03-20 Rig Released
1985-04-04 Perforation Treatment Performed - Jet Perforation
1985-04-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-04-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-04-08 Plug Back Performed
1985-08-17 Perforation Treatment Performed - Jet Perforation
1985-08-17 Well Log Performed
1985-08-19 Perforation Treatment Performed - Fractured
1985-08-29 Well Began Production
1985-08-29 Well Fluid changed to Crude Oil
1985-08-29 Well Mode changed to Flowing
1988-09-06 Well Fluid changed to Crude Oil
1988-09-06 Well Mode changed to Pumping
2015-02-01 Well Fluid changed to Crude Oil
2015-02-01 Well Mode changed to Suspended
2020-02-01 Well Fluid changed to Crude Oil
2020-02-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-04-04 Perforation 2194.00 2199.00 13
1985-04-05 Acid Treatment 2194.00 2199.00 0
1985-04-08 Packing Device Capped w/Cement 2180.80 2189.00 0
1985-08-17 Perforation 1623.00 1630.00 13
1985-08-19 Fracture 1623.00 1630.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 2316 0.0 0.0 0.0
1986 8519 0.0 0.0 0.0
1987 8568 0.0 0.0 0.0
1988 7159 0.0 0.0 0.0
1989 8303 0.0 0.0 0.0
1990 8735 0.0 0.0 0.0
1991 8735 0.0 0.0 0.0
1992 8363 0.0 0.0 0.0
1993 8172 0.0 0.0 0.0
1994 7584 0.0 0.0 0.0
1995 7299 0.0 0.0 0.0
1996 8114 0.0 0.0 0.0
1997 8472 0.0 0.0 0.0
1998 8567 0.0 0.0 0.0
1999 8667 0.0 0.0 0.0
2000 8604 0.0 0.0 0.0
2001 8650 0.0 0.0 0.0
2002 8625 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8495 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8700 0.0 0.0 0.0
2008 8423 0.0 0.0 0.0
2009 8108 0.0 0.0 0.0
2010 8327 0.0 0.0 0.0
2011 4516 0.0 0.0 0.0
2013 24 0.0 0.0 0.0
2020 504 0.0 0.0 0.0

For data sources see[5]

References