X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475073508002

Well Details

Well ID: 0475073508002
Loading map...
Location: 00/08-35-047-07W5/2
Location Alias: 00/08-35-47-07 W5M
Location Alias 2: 00/08-35-047-07 W5/02
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 07
Section: 35
County/Municipality: Brazeau County
Well Name: ARC BC35 08-35
Operator Name: ARC Resources Ltd.
License Number: 0007598
License Date: 1954-01-14
License Status: Issued
Spud Date: 1954-01-17
Final Drill Date: 1954-03-17
Well Total Depth: 2139.70 m
Surface Hole Latitude: 53.095990
Surface Hole Longitude: -114.906856

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-01-14 Obtained License
1954-01-30 Drill Stem Test Performed
1954-01-31 Drill Stem Test Performed
1954-02-02 Drill Stem Test Performed
1954-02-03 Drill Stem Test Performed
1954-02-04 Drill Stem Test Performed
1954-02-06 Drill Stem Test Performed
1954-02-10 Drill Stem Test Performed
1954-02-20 Drill Stem Test Performed
1954-02-27 Drill Stem Test Performed
1954-03-04 Drill Stem Test Performed
1954-03-05 Drill Stem Test Performed
1954-03-06 Drill Stem Test Performed
1954-03-07 Drill Stem Test Performed
1954-03-16 Well Log Performed
1954-03-17 Finished Drilling
1954-03-17 Well Mode changed to Drilled and Cased
1954-03-18 Liner Casing Operation Performed
1954-07-09 Perforation Treatment Performed - Jet Perforation
1954-11-03 Perforation Treatment Performed - Cement Plug
1954-11-04 Perforation Treatment Performed - Jet Perforation
1954-11-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-11-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1954-11-10 Perforation Treatment Performed - Bullet Perforation
1954-11-10 Perforation Treatment Performed - Jet Perforation
1955-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-03-16 Perforation Treatment Performed - Fractured
1955-05-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1955-05-20 Perforation Treatment Performed - Jet Perforation
1955-05-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-05-21 Perforation Treatment Performed - Fractured
1955-07-07 Well Began Production
1955-07-07 Well Fluid changed to Crude Oil
1955-07-07 Well Mode changed to Flowing
1956-02-23 Perforation Treatment Performed - Jet Perforation
1958-03-01 Well Began Injection
1958-03-01 Well Fluid changed to Water
1958-03-01 Well Type changed to Injection
1959-10-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-06-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-06-07 Perforation Treatment Performed - Fractured
1961-04-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-10-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-10-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-12-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-06-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-07-09 Perforation 2065.90 2066.50 13
1955-05-13 Packing Device Capped w/Cement 1618.50 1618.50 0
1955-05-20 Perforation 1536.50 1540.50 13
1955-05-21 Acid Treatment 1536.50 1540.50 0
1955-05-21 Fracture 1536.50 1540.50 0
1956-02-23 Perforation 1529.80 1533.40 13
1959-10-26 Acid Treatment 1529.80 1540.50 0
1960-06-07 Acid Treatment 1529.80 1540.50 0
1960-06-07 Fracture 1529.80 1540.50 0
1961-04-20 Acid Treatment 1529.80 1540.50 0
1961-10-27 Acid Treatment 1529.80 1540.50 0
1954-11-03 Cement Plug 1988.80 2027.80 0
1971-10-07 Acid Treatment 1529.80 1540.50 0
1973-12-21 Acid Treatment 1529.80 1540.50 0
1977-06-02 Acid Treatment 1529.80 1540.50 0
1991-03-28 Acid Treatment 1529.80 1540.50 0
1954-11-04 Perforation 1975.10 1981.20 13
1954-11-06 Acid Treatment 1975.10 1981.20 0
1954-11-10 Packing Device Capped w/Cement 1834.90 1834.90 0
1954-11-10 Perforation 1819.00 1821.50 13
1954-11-10 Bullet Perforation 1819.00 1821.50 13
1955-03-15 Acid Treatment 1819.00 1821.50 0
1955-03-16 Fracture 1819.00 1821.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References