X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475072909000

Well Details

Well ID: 0475072909000
Loading map...
Location: 00/09-29-047-07W5/0
Location Alias: 00/09-29-47-07 W5M
Location Alias 2: 00/09-29-047-07 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 07
Section: 29
County/Municipality: Brazeau County
Well Name: ARC PEMBINA 9-29-47-7
Operator Name: ARC Resources Ltd.
License Number: 0424572
License Date: 2010-10-14
License Status: Issued
Spud Date: 2010-11-25
Final Drill Date: 2010-12-12
Well Total Depth: 2590.00 m
Surface Hole Latitude: 53.074506
Surface Hole Longitude: -114.992648

For data sources see[1][2]

Well History

Date Event
2010-10-14 Obtained License
2010-11-29 Surface Casing Operation Performed
2010-12-01 Direction Drilling Operation Performed - Deviate
2010-12-05 Well Log Performed
2010-12-06 Intermediate Casing Operation Performed
2010-12-08 Direction Drilling Operation Performed - Horizontal
2010-12-12 Finished Drilling
2010-12-12 Well Mode changed to Drilled and Cased
2010-12-17 Liner Casing Operation Performed
2010-12-17 Perforation Treatment Performed - Open-Hole Completion
2010-12-19 Rig Released
2011-01-04 Well Log Performed
2011-01-05 Well Log Performed
2011-02-25 Perforation Treatment Performed - Multi-Stage Fracture
2011-02-26 Perforation Treatment Performed - Multi-Stage Fracture
2011-03-02 Perforation Treatment Performed - Multi-Stage Fracture
2011-03-03 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-14 Well Began Production
2011-10-14 Well Fluid changed to Crude Oil
2011-10-14 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-12-01 475.00 Deviate (5 - 79 degrees)
2010-12-08 1569.20 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-12-17 Open Hole/Barefoot Completion 2588.50 2590.00 0
2011-02-25 Multi-Stage Fracture 2521.10 2521.20 0
2011-02-26 Multi-Stage Fracture 2400.60 2400.70 0
2011-02-26 Multi-Stage Fracture 2297.60 2297.70 0
2011-03-02 Multi-Stage Fracture 2183.70 2183.80 0
2011-03-02 Multi-Stage Fracture 2069.60 2069.70 0
2011-03-02 Multi-Stage Fracture 1930.30 1930.40 0
2011-03-03 Multi-Stage Fracture 1814.80 1814.90 0
2011-03-03 Multi-Stage Fracture 1675.80 1675.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1440 0.0 0.0 0.0
2012 7878 0.0 0.0 0.0
2013 7554 0.0 0.0 0.0
2014 8090 0.0 0.0 0.0
2015 8550 0.0 0.0 0.0
2016 8436 0.0 0.0 0.0
2017 7457 0.0 0.0 0.0
2018 8139 0.0 0.0 0.0
2019 7777 0.0 0.0 0.0
2020 1366 0.0 0.0 0.0

For data sources see[6]

References