X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475072710000

Well Details

Well ID: 0475072710000
Loading map...
Location: 00/10-27-047-07W5/0
Location Alias: 00/10-27-47-07 W5M
Location Alias 2: 00/10-27-047-07 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 07
Section: 27
County/Municipality: Brazeau County
Well Name: ARC-SEABOARD-BUCK CRK 27 10-27-47-7
Operator Name: ARC Resources Ltd.
License Number: 0009198
License Date: 1955-02-18
License Status: Issued
Spud Date: 1955-03-28
Final Drill Date: 1955-05-31
Well Total Depth: 1568.20 m
Surface Hole Latitude: 53.085141
Surface Hole Longitude: -114.937316

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1955-02-18 Obtained License
1955-05-23 Drill Stem Test Performed
1955-05-31 Finished Drilling
1955-05-31 Production Casing Operation Performed
1955-05-31 Well Mode changed to Drilled and Cased
1955-06-07 Perforation Treatment Performed - Jet Perforation
1955-06-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-06-09 Perforation Treatment Performed - Fractured
1955-06-11 Well Began Production
1955-06-11 Well Fluid changed to Crude Oil
1955-06-11 Well Mode changed to Flowing
1956-01-09 Well Fluid changed to Crude Oil
1956-01-09 Well Mode changed to Pumping
1958-08-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-08-28 Perforation Treatment Performed - Fractured
1974-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-10-09 Perforation Treatment Performed - Chemical Squeeze
1982-05-29 Perforation Treatment Performed - Fractured
2005-12-07 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1955-06-07 Perforation 1528.90 1533.80 13
1955-06-09 Acid Treatment 1528.90 1533.80 0
1955-06-09 Fracture 1528.90 1533.80 0
1958-08-28 Acid Treatment 1528.90 1533.80 0
1958-08-28 Fracture 1528.90 1533.80 0
1974-10-09 Chemical Squeeze 1528.90 1533.80 0
1974-10-09 Acid Treatment 1528.90 1533.80 0
1982-05-29 Fracture 1528.90 1533.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4674 0.0 0.0 0.0
1968 6431 0.0 0.0 0.0
1969 6670 0.0 0.0 0.0
1970 8254 0.0 0.0 0.0
1971 8495 0.0 0.0 0.0
1972 8391 0.0 0.0 0.0
1973 8495 0.0 0.0 0.0
1974 8346 0.0 0.0 0.0
1975 8545 0.0 0.0 0.0
1976 8687 0.0 0.0 0.0
1977 8649 0.0 0.0 0.0
1978 8646 0.0 0.0 0.0
1979 8467 0.0 0.0 0.0
1980 8378 0.0 0.0 0.0
1981 8152 0.0 0.0 0.0
1982 7663 0.0 0.0 0.0
1983 7888 0.0 0.0 0.0
1984 8279 0.0 0.0 0.0
1985 8612 0.0 0.0 0.0
1986 8385 0.0 0.0 0.0
1987 8575 0.0 0.0 0.0
1988 8284 0.0 0.0 0.0
1989 8325 0.0 0.0 0.0
1990 8431 0.0 0.0 0.0
1991 8506 0.0 0.0 0.0
1992 8774 0.0 0.0 0.0
1993 8655 0.0 0.0 0.0
1994 8599 0.0 0.0 0.0
1995 8666 0.0 0.0 0.0
1996 8769 0.0 0.0 0.0
1997 8551 0.0 0.0 0.0
1998 8276 0.0 0.0 0.0
1999 8657 0.0 0.0 0.0
2000 8555 0.0 0.0 0.0
2001 8610 0.0 0.0 0.0
2002 8589 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8591 0.0 0.0 0.0
2005 8735 0.0 0.0 0.0
2006 8535 0.0 0.0 0.0
2007 8711 0.0 0.0 0.0
2008 8640 0.0 0.0 0.0
2009 8616 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8013 0.0 0.0 0.0
2012 5724 0.0 0.0 0.0
2013 7752 0.0 0.0 0.0
2014 8677 0.0 0.0 0.0
2015 8735 0.0 0.0 0.0
2016 8652 0.0 0.0 0.0
2017 7872 0.0 0.0 0.0
2018 7782 0.0 0.0 0.0
2019 8393 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References