X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475072602000

Well Details

Well ID: 0475072602000
Loading map...
Location: 00/02-26-047-07W5/0
Location Alias: 00/02-26-47-07 W5M
Location Alias 2: 00/02-26-047-07 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 07
Section: 26
County/Municipality: Brazeau County
Well Name: FCPI PEMBINA 2-26-47-7
Operator Name: InPlay Oil Corp.
License Number: 0008264
License Date: 1954-07-22
License Status: Suspension
Spud Date: 1954-07-26
Final Drill Date: 1954-10-27
Well Total Depth: 1570.60 m
Surface Hole Latitude: 53.077914
Surface Hole Longitude: -114.912871

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-07-22 Obtained License
1954-10-27 Finished Drilling
1954-10-27 Well Mode changed to Drilled and Cased
1954-10-28 Liner Casing Operation Performed
1954-11-16 Perforation Treatment Performed - Open-Hole Completion
1954-11-18 Perforation Treatment Performed - Fractured
1954-12-04 Well Began Production
1954-12-04 Well Fluid changed to Crude Oil
1954-12-04 Well Mode changed to Flowing
1955-01-31 Perforation Treatment Performed - Fractured
1955-06-19 Well Fluid changed to Crude Oil
1955-06-19 Well Mode changed to Pumping
1956-12-18 Perforation Treatment Performed - Fractured
1961-05-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-05-30 Perforation Treatment Performed - Cement Plug
1961-06-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-06-01 Perforation Treatment Performed - Fractured
1961-06-01 Perforation Treatment Performed - Jet Perforation
1974-02-01 Well Fluid changed to Crude Oil
1974-02-01 Well Mode changed to Suspended
2007-06-17 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-11-16 Open Hole/Barefoot Completion 1550.50 1570.60 0
1961-06-01 Fracture 1553.30 1555.40 0
1954-11-18 Fracture 1550.50 1570.60 0
1955-01-31 Fracture 1550.50 1570.60 0
1956-12-18 Fracture 1550.50 1570.60 0
1961-05-28 Acid Treatment 1550.50 1570.60 0
1961-05-30 Cement Plug 1550.50 1570.60 0
1961-05-30 Cement Plug 1550.50 1568.20 0
1961-06-01 Perforation 1553.30 1555.40 13
1961-06-01 Acid Treatment 1553.30 1555.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8733 0.0 0.0 0.0
1968 8720 0.0 0.0 0.0
1969 8741 0.0 0.0 0.0
1970 8549 0.0 0.0 0.0
1971 8440 0.0 0.0 0.0
1972 8110 0.0 0.0 0.0
1973 8561 0.0 0.0 0.0
1974 48 0.0 0.0 0.0

For data sources see[5]

References