If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0475063603020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.114928,"lon":-114.746271,"icon":""}]} |
Location: 02/03-36-047-06W5/0 | |
Location Alias: 02/03-36-47-06 W5M | |
Location Alias 2: 02/03-36-047-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 5 | |
Range: 06 | |
Section: 36 | |
County/Municipality: Brazeau County | |
Well Name: BONTERRA 102 HZ PEMBINA 3-36-47-6 | |
Operator Name: Bonterra Energy Corp. | |
License Number: 0465979 | |
License Date: 2014-03-31 | |
License Status: Issued | |
Spud Date: 2014-07-21 | |
Final Drill Date: 2014-07-28 | |
Well Total Depth: 4005.00 m | |
Surface Hole Latitude: 53.114928 | |
Surface Hole Longitude: -114.746271 |
Date | Event |
---|---|
2014-03-31 | Obtained License |
2014-07-22 | Direction Drilling Operation Performed - Deviate |
2014-07-22 | Surface Casing Operation Performed |
2014-07-23 | Direction Drilling Operation Performed - Horizontal |
2014-07-28 | Finished Drilling |
2014-07-28 | Well Mode changed to Drilled and Cased |
2014-07-29 | Production Casing Operation Performed |
2014-07-30 | Rig Released |
2014-08-02 | Well Began Production |
2014-08-02 | Well Fluid changed to Crude Oil |
2014-08-02 | Well Mode changed to Pumping |
2014-08-10 | Well Log Performed |
2014-08-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-08-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-09-01 | Well Log Performed |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2014-07-21 | Ironhand Drilling Inc. | 1 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-07-22 | 694.50 | Deviate (5 - 79 degrees) |
2014-07-23 | 1592.80 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-08-19 | Multi-Stage Fracture | 3928.30 | 3929.20 | 0 |
2014-08-19 | Multi-Stage Fracture | 3424.20 | 3426.10 | 0 |
2014-08-19 | Multi-Stage Fracture | 3366.60 | 3368.50 | 0 |
2014-08-19 | Multi-Stage Fracture | 3312.40 | 3314.30 | 0 |
2014-08-19 | Multi-Stage Fracture | 3254.60 | 3256.50 | 0 |
2014-08-19 | Multi-Stage Fracture | 3198.90 | 3200.80 | 0 |
2014-08-19 | Multi-Stage Fracture | 3145.80 | 3147.70 | 0 |
2014-08-20 | Multi-Stage Fracture | 3088.90 | 3090.60 | 0 |
2014-08-20 | Multi-Stage Fracture | 3033.40 | 3035.30 | 0 |
2014-08-20 | Multi-Stage Fracture | 2977.60 | 2979.50 | 0 |
2014-08-20 | Multi-Stage Fracture | 2920.00 | 2921.90 | 0 |
2014-08-19 | Multi-Stage Fracture | 3876.10 | 3878.00 | 0 |
2014-08-20 | Multi-Stage Fracture | 2862.40 | 2864.30 | 0 |
2014-08-20 | Multi-Stage Fracture | 2804.60 | 2806.50 | 0 |
2014-08-20 | Multi-Stage Fracture | 2760.60 | 2762.40 | 0 |
2014-08-20 | Multi-Stage Fracture | 2702.90 | 2704.80 | 0 |
2014-08-20 | Multi-Stage Fracture | 2645.10 | 2647.00 | 0 |
2014-08-20 | Multi-Stage Fracture | 2587.30 | 2589.20 | 0 |
2014-08-20 | Multi-Stage Fracture | 2529.80 | 2531.70 | 0 |
2014-08-20 | Multi-Stage Fracture | 2472.20 | 2474.20 | 0 |
2014-08-20 | Multi-Stage Fracture | 2414.50 | 2416.40 | 0 |
2014-08-20 | Multi-Stage Fracture | 2357.10 | 2359.00 | 0 |
2014-08-19 | Multi-Stage Fracture | 3818.70 | 3820.50 | 0 |
2014-08-20 | Multi-Stage Fracture | 2299.20 | 2301.20 | 0 |
2014-08-20 | Multi-Stage Fracture | 2241.50 | 2243.30 | 0 |
2014-08-20 | Multi-Stage Fracture | 2197.10 | 2199.00 | 0 |
2014-08-20 | Multi-Stage Fracture | 2139.80 | 2141.70 | 0 |
2014-08-20 | Multi-Stage Fracture | 2082.00 | 2083.90 | 0 |
2014-08-20 | Multi-Stage Fracture | 2024.20 | 2026.10 | 0 |
2014-08-20 | Multi-Stage Fracture | 1966.40 | 1968.30 | 0 |
2014-08-20 | Multi-Stage Fracture | 1908.70 | 1910.50 | 0 |
2014-08-20 | Multi-Stage Fracture | 1850.80 | 1852.70 | 0 |
2014-08-20 | Multi-Stage Fracture | 1793.50 | 1795.30 | 0 |
2014-08-19 | Multi-Stage Fracture | 3762.40 | 3764.30 | 0 |
2014-08-20 | Multi-Stage Fracture | 1738.60 | 1740.50 | 0 |
2014-08-20 | Multi-Stage Fracture | 1681.30 | 1683.20 | 0 |
2014-08-20 | Multi-Stage Fracture | 1637.60 | 1639.40 | 0 |
2014-08-19 | Multi-Stage Fracture | 3706.40 | 3708.30 | 0 |
2014-08-19 | Multi-Stage Fracture | 3649.40 | 3651.30 | 0 |
2014-08-19 | Multi-Stage Fracture | 3594.70 | 3596.60 | 0 |
2014-08-19 | Multi-Stage Fracture | 3539.40 | 3541.20 | 0 |
2014-08-19 | Multi-Stage Fracture | 3481.70 | 3483.50 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-08-19 | 2014-08-20 | 1,458 | 3,194 | N/A |
2 | 2014-08-19 | 2014-08-19 | 1,458 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 83.049 | N/A | |||
20/40 | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 11.0344 | N/A | ||
30/50 | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 5.5172 | N/A | ||
SCC-6L | Sanjel | Clay Control | 1.6-Hexanediamine dihydrochloride | 6055-52-3 | 100 | 0.1645 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.1645 | N/A | ||||
FRW-3 | Sanjel | Friction Reducer | Isoparaffinic Solvent | 64742-47-8 | 100 | 0.0883 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.0883 | N/A | ||||
Surfactant | 68131-40-8 | 100 | 0.0883 | N/A | ||||
WG-2BL | Sanjel | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.0486 | N/A | |
NE-5 | Sanjel | Surfactant | Alkyl benzenesulfonic acid | 68584-22-5 | 100 | 0.0889 | N/A | |
Diethylenetriamine | 111-40-0 | 100 | 0.0889 | N/A | ||||
Isopropyl Alcohol | 67-63-0 | 100 | 0.0889 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0889 | N/A | ||||
2 | 40/70 | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 0.368 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-08-04 | 2014-08-12 | Surface Water - Lake | 1900 |
2014-08-19 | 2014-08-21 | Recycled Fracturing Water (treated at well site) | 694 |
2014-08-19 | 2014-08-21 | Recycled Fracturing Water (treated at well site) | 600 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 2685 | 0.0 | 0.0 | 0.0 |
2015 | 7929 | 0.0 | 0.0 | 0.0 |
2016 | 8297 | 0.0 | 0.0 | 0.0 |
2017 | 8642 | 0.0 | 0.0 | 0.0 |
2018 | 8407 | 0.0 | 0.0 | 0.0 |
2019 | 8702 | 0.0 | 0.0 | 0.0 |
2020 | 2173 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-07-30 | No Incident Encountered | 0.00 | 0.00 |
2014-08-20 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]