X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475063603000

Well Details

Well ID: 0475063603000
Loading map...
Location: 00/03-36-047-06W5/0
Location Alias: 00/03-36-47-06 W5M
Location Alias 2: 00/03-36-047-06 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 06
Section: 36
County/Municipality: Brazeau County
Well Name: BONTERRA HZ PEMBINA 3-36-47-6
Operator Name: Bonterra Energy Corp.
License Number: 0465963
License Date: 2014-03-28
License Status: Issued
Spud Date: 2014-07-31
Final Drill Date: 2014-08-06
Well Total Depth: 4008.00 m
Surface Hole Latitude: 53.114928
Surface Hole Longitude: -114.746420

For data sources see[1][2]

Well History

Date Event
2014-03-28 Obtained License
2014-07-31 Surface Casing Operation Performed
2014-08-01 Direction Drilling Operation Performed - Deviate
2014-08-02 Direction Drilling Operation Performed - Horizontal
2014-08-06 Finished Drilling
2014-08-06 Well Mode changed to Drilled and Cased
2014-08-08 Production Casing Operation Performed
2014-08-08 Rig Released
2014-08-10 Well Log Performed
2014-08-21 Perforation Treatment Performed - Multi-Stage Fracture
2014-08-22 Perforation Treatment Performed - Multi-Stage Fracture
2014-08-26 Well Began Production
2014-08-26 Well Fluid changed to Crude Oil
2014-08-26 Well Mode changed to Pumping
2014-09-02 Well Log Performed

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-07-31 Ironhand Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-08-01 498.70 Deviate (5 - 79 degrees)
2014-08-02 1600.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-08-21 Multi-Stage Fracture 3926.70 3927.60 0
2014-08-21 Multi-Stage Fracture 3447.20 3449.00 0
2014-08-21 Multi-Stage Fracture 3392.80 3394.70 0
2014-08-21 Multi-Stage Fracture 3339.10 3341.00 0
2014-08-21 Multi-Stage Fracture 3281.60 3283.40 0
2014-08-21 Multi-Stage Fracture 3223.70 3225.60 0
2014-08-21 Multi-Stage Fracture 3165.60 3167.50 0
2014-08-21 Multi-Stage Fracture 3108.10 3109.90 0
2014-08-21 Multi-Stage Fracture 3063.60 3065.40 0
2014-08-21 Multi-Stage Fracture 3005.60 3007.50 0
2014-08-21 Multi-Stage Fracture 2947.80 2949.70 0
2014-08-21 Multi-Stage Fracture 3887.10 3888.90 0
2014-08-21 Multi-Stage Fracture 2890.50 2892.30 0
2014-08-21 Multi-Stage Fracture 2832.70 2834.60 0
2014-08-21 Multi-Stage Fracture 2776.30 2778.10 0
2014-08-21 Multi-Stage Fracture 2720.30 2722.10 0
2014-08-21 Multi-Stage Fracture 2662.60 2664.40 0
2014-08-21 Multi-Stage Fracture 2604.70 2606.50 0
2014-08-21 Multi-Stage Fracture 2546.80 2548.60 0
2014-08-21 Multi-Stage Fracture 2502.30 2504.10 0
2014-08-21 Multi-Stage Fracture 2444.40 2446.30 0
2014-08-22 Multi-Stage Fracture 2386.60 2388.50 0
2014-08-21 Multi-Stage Fracture 3829.60 3831.40 0
2014-08-22 Multi-Stage Fracture 2328.90 2330.80 0
2014-08-22 Multi-Stage Fracture 2271.00 2272.90 0
2014-08-22 Multi-Stage Fracture 2213.10 2215.00 0
2014-08-22 Multi-Stage Fracture 2155.30 2157.20 0
2014-08-22 Multi-Stage Fracture 2097.50 2099.30 0
2014-08-22 Multi-Stage Fracture 2039.60 2041.50 0
2014-08-22 Multi-Stage Fracture 1981.80 1983.60 0
2014-08-22 Multi-Stage Fracture 1923.90 1925.80 0
2014-08-22 Multi-Stage Fracture 1866.20 1868.00 0
2014-08-22 Multi-Stage Fracture 1808.20 1810.10 0
2014-08-21 Multi-Stage Fracture 3776.20 3778.00 0
2014-08-22 Multi-Stage Fracture 1750.30 1752.10 0
2014-08-22 Multi-Stage Fracture 1692.70 1694.60 0
2014-08-22 Multi-Stage Fracture 1634.90 1636.80 0
2014-08-21 Multi-Stage Fracture 3719.90 3721.70 0
2014-08-21 Multi-Stage Fracture 3661.90 3663.80 0
2014-08-21 Multi-Stage Fracture 3617.80 3619.60 0
2014-08-21 Multi-Stage Fracture 3560.10 3562.00 0
2014-08-21 Multi-Stage Fracture 3502.40 3504.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-08-21 2014-08-22 1,457 3,191 N/A
2 2014-08-21 2014-08-21 1,457 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 83.0084 N/A
20/40 Sanjel Crystalline Silica 14808-60-7 100 11.072 N/A
30/50 Sanjel Crystalline Silica 14808-60-7 100 5.536 N/A
SCC-6L Sanjel Clay Control 1.6-Hexanediamine dihydrochloride 6055-52-3 100 0.1708 N/A
Non-Hazardous Ingredients Not Available 100 0.1708 N/A
FRW-3 Sanjel Friction Reducer Isoparaffinic Solvent 64742-47-8 100 0.0884 N/A
Non-Hazardous Ingredients Not Available 100 0.0884 N/A
Surfactant 68131-40-8 100 0.0884 N/A
WG-2BL Sanjel Gelling Agent No hazardous ingredients Not Available 100 0.0348 N/A
NE-5 Sanjel Surfactant Alkyl benzenesulfonic acid 68584-22-5 100 0.0814 N/A
Diethylenetriamine 111-40-0 100 0.0814 N/A
Isopropyl Alcohol 67-63-0 100 0.0814 N/A
Non-Hazardous Ingredients Not Available 100 0.0814 N/A
2 40/70 Sanjel Crystalline Silica 14808-60-7 100 0.3333 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-08-04 2014-08-12 Surface Water - Lake 2686
2014-08-20 2014-08-22 Recycled Fracturing Water (treated at well site) 505

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 2311 0.0 0.0 0.0
2015 7760 0.0 0.0 0.0
2016 8110 0.0 0.0 0.0
2017 8578 0.0 0.0 0.0
2018 8430 0.0 0.0 0.0
2019 8486 0.0 0.0 0.0
2020 2173 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-08-08 No Incident Encountered 0.00 0.00
2014-08-22 No Incident Encountered 0.00 0.00

For data sources see[10]

References