If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0475063602020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.114929,"lon":-114.745972,"icon":""}]} |
Location: 02/02-36-047-06W5/0 | |
Location Alias: 02/02-36-47-06 W5M | |
Location Alias 2: 02/02-36-047-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 5 | |
Range: 06 | |
Section: 36 | |
County/Municipality: Brazeau County | |
Well Name: BONTERRA 102 HZ PEMBINA 2-36-47-6 | |
Operator Name: Bonterra Energy Corp. | |
License Number: 0465967 | |
License Date: 2014-03-28 | |
License Status: Issued | |
Spud Date: 2014-07-03 | |
Final Drill Date: 2014-07-09 | |
Well Total Depth: 4005.00 m | |
Surface Hole Latitude: 53.114929 | |
Surface Hole Longitude: -114.745972 |
Date | Event |
---|---|
2014-03-28 | Obtained License |
2014-07-04 | Surface Casing Operation Performed |
2014-07-05 | Direction Drilling Operation Performed - Deviate |
2014-07-06 | Direction Drilling Operation Performed - Horizontal |
2014-07-09 | Finished Drilling |
2014-07-09 | Well Mode changed to Drilled and Cased |
2014-07-11 | Rig Released |
2014-08-01 | Well Log Performed |
2014-08-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-08-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-08-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-08-23 | Well Began Production |
2014-08-23 | Well Fluid changed to Crude Oil |
2014-08-23 | Well Mode changed to Pumping |
2014-08-26 | Well Log Performed |
2014-11-07 | Production Casing Operation Performed |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2014-07-03 | Ironhand Drilling Inc. | 1 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-07-05 | 529.70 | Deviate (5 - 79 degrees) |
2014-07-06 | 1649.30 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-08-14 | Multi-Stage Fracture | 3976.50 | 3977.40 | 0 |
2014-08-15 | Multi-Stage Fracture | 3474.60 | 3476.70 | 0 |
2014-08-15 | Multi-Stage Fracture | 3417.20 | 3419.20 | 0 |
2014-08-15 | Multi-Stage Fracture | 3359.60 | 3361.70 | 0 |
2014-08-15 | Multi-Stage Fracture | 3302.40 | 3304.50 | 0 |
2014-08-15 | Multi-Stage Fracture | 3244.80 | 3246.90 | 0 |
2014-08-15 | Multi-Stage Fracture | 3187.40 | 3189.50 | 0 |
2014-08-15 | Multi-Stage Fracture | 3143.40 | 3145.50 | 0 |
2014-08-15 | Multi-Stage Fracture | 3085.90 | 3088.00 | 0 |
2014-08-15 | Multi-Stage Fracture | 3028.40 | 3030.50 | 0 |
2014-08-15 | Multi-Stage Fracture | 2970.50 | 2972.60 | 0 |
2014-08-15 | Multi-Stage Fracture | 3920.90 | 3922.90 | 0 |
2014-08-15 | Multi-Stage Fracture | 2912.80 | 2914.90 | 0 |
2014-08-15 | Multi-Stage Fracture | 2855.30 | 2857.40 | 0 |
2014-08-15 | Multi-Stage Fracture | 2797.90 | 2800.00 | 0 |
2014-08-15 | Multi-Stage Fracture | 2740.60 | 2742.60 | 0 |
2014-08-15 | Multi-Stage Fracture | 2683.20 | 2685.30 | 0 |
2014-08-16 | Multi-Stage Fracture | 2626.00 | 2628.10 | 0 |
2014-08-16 | Multi-Stage Fracture | 2581.90 | 2584.00 | 0 |
2014-08-16 | Multi-Stage Fracture | 2524.50 | 2526.50 | 0 |
2014-08-16 | Multi-Stage Fracture | 2467.10 | 2469.10 | 0 |
2014-08-16 | Multi-Stage Fracture | 2409.60 | 2411.60 | 0 |
2014-08-15 | Multi-Stage Fracture | 3864.50 | 3865.60 | 0 |
2014-08-16 | Multi-Stage Fracture | 2352.20 | 2354.30 | 0 |
2014-08-16 | Multi-Stage Fracture | 2294.70 | 2296.80 | 0 |
2014-08-16 | Multi-Stage Fracture | 2237.30 | 2239.40 | 0 |
2014-08-16 | Multi-Stage Fracture | 2179.80 | 2181.90 | 0 |
2014-08-16 | Multi-Stage Fracture | 2122.40 | 2124.50 | 0 |
2014-08-16 | Multi-Stage Fracture | 2065.00 | 2067.00 | 0 |
2014-08-16 | Multi-Stage Fracture | 2020.90 | 2022.90 | 0 |
2014-08-16 | Multi-Stage Fracture | 1963.40 | 1965.50 | 0 |
2014-08-16 | Multi-Stage Fracture | 1905.90 | 1907.90 | 0 |
2014-08-16 | Multi-Stage Fracture | 1861.70 | 1863.80 | 0 |
2014-08-15 | Multi-Stage Fracture | 3806.00 | 3808.10 | 0 |
2014-08-16 | Multi-Stage Fracture | 1804.30 | 1806.30 | 0 |
2014-08-16 | Multi-Stage Fracture | 1746.80 | 1748.90 | 0 |
2014-08-16 | Multi-Stage Fracture | 1702.70 | 1704.70 | 0 |
2014-08-15 | Multi-Stage Fracture | 3748.60 | 3750.70 | 0 |
2014-08-15 | Multi-Stage Fracture | 3704.50 | 3706.60 | 0 |
2014-08-15 | Multi-Stage Fracture | 3646.90 | 3649.00 | 0 |
2014-08-15 | Multi-Stage Fracture | 3589.60 | 3591.60 | 0 |
2014-08-15 | Multi-Stage Fracture | 3532.10 | 3534.20 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-08-14 | 2014-08-16 | 1,453 | 3,123 | N/A |
2 | 2014-08-14 | 2014-08-14 | 1,453 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 82.7113 | N/A | |||
20/40 | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 11.2448 | N/A | ||
30/50 | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 5.6132 | N/A | ||
SCC-6L | Sanjel | Clay Control | 1.6-Hexanediamine dihydrochloride | 6055-52-3 | 100 | 0.1902 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.1902 | N/A | ||||
FRW-3 | Sanjel | Friction Reducer | Isoparaffinic Solvent | 64742-47-8 | 100 | 0.0982 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.0982 | N/A | ||||
Surfactant | 68131-40-8 | 100 | 0.0982 | N/A | ||||
WG-2BL | Sanjel | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.043 | N/A | |
NE-5 | Sanjel | Surfactant | Alkyl benzenesulfonic acid | 68584-22-5 | 100 | 0.0899 | N/A | |
Diethylenetriamine | 111-40-0 | 100 | 0.0899 | N/A | ||||
Isopropyl Alcohol | 67-63-0 | 100 | 0.0899 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0899 | N/A | ||||
2 | 40/70 | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 0.384 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-08-04 | 2014-08-12 | Surface Water - Lake | 2024 |
2014-08-20 | 2014-08-22 | Recycled Fracturing Water (treated at well site) | 1099 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 2820 | 0.0 | 0.0 | 0.0 |
2015 | 8688 | 0.0 | 0.0 | 0.0 |
2016 | 8695 | 0.0 | 0.0 | 0.0 |
2017 | 8684 | 0.0 | 0.0 | 0.0 |
2018 | 8533 | 0.0 | 0.0 | 0.0 |
2019 | 8678 | 0.0 | 0.0 | 0.0 |
2020 | 2089 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-07-11 | No Incident Encountered | 0.00 | 0.00 |
2014-08-16 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]