X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475053305020

Well Details

Well ID: 0475053305020
Loading map...
Location: 02/05-33-047-05W5/0
Location Alias: 02/05-33-47-05 W5M
Location Alias 2: 02/05-33-047-05 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 05
Section: 33
County/Municipality: Brazeau County
Well Name: BONTERRA 102 HZ PEMBINA 5-33-47-5
Operator Name: Bonterra Energy Corp.
License Number: 0490799
License Date: 2018-09-06
License Status: Issued
Spud Date: 2019-01-04
Final Drill Date: 2019-01-09
Well Total Depth: 3032.00 m
Surface Hole Latitude: 53.092677
Surface Hole Longitude: -114.656464

For data sources see[1][2]

Well History

Date Event
2018-09-06 Obtained License
2019-01-05 Direction Drilling Operation Performed - Deviate
2019-01-05 Surface Casing Operation Performed
2019-01-07 Direction Drilling Operation Performed - Horizontal
2019-01-09 Finished Drilling
2019-01-09 Well Log Performed
2019-01-09 Well Mode changed to Drilled and Cased
2019-01-10 Production Casing Operation Performed
2019-01-10 Rig Released
2019-01-24 Well Log Performed
2019-01-28 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-29 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-09 Well Began Production
2019-02-09 Well Fluid changed to Crude Oil
2019-02-09 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-01-04 Ironhand Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-01-05 498.50 Deviate (5 - 79 degrees)
2019-01-07 1570.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-01-28 Multi-Stage Fracture 2982.80 2984.70 0
2019-01-29 Multi-Stage Fracture 2535.20 2537.10 0
2019-01-29 Multi-Stage Fracture 2485.10 2487.00 0
2019-01-29 Multi-Stage Fracture 2435.70 2437.60 0
2019-01-29 Multi-Stage Fracture 2385.30 2387.20 0
2019-01-29 Multi-Stage Fracture 2335.90 2337.80 0
2019-01-29 Multi-Stage Fracture 2286.10 2288.00 0
2019-01-29 Multi-Stage Fracture 2235.70 2237.60 0
2019-01-29 Multi-Stage Fracture 2185.60 2187.50 0
2019-01-29 Multi-Stage Fracture 2135.60 2137.50 0
2019-01-29 Multi-Stage Fracture 2085.50 2087.40 0
2019-01-28 Multi-Stage Fracture 2933.00 2934.90 0
2019-01-29 Multi-Stage Fracture 2036.10 2038.00 0
2019-01-29 Multi-Stage Fracture 1986.40 1988.30 0
2019-01-29 Multi-Stage Fracture 1937.00 1938.90 0
2019-01-29 Multi-Stage Fracture 1887.20 1889.10 0
2019-01-29 Multi-Stage Fracture 1837.50 1839.40 0
2019-01-29 Multi-Stage Fracture 1788.20 1790.10 0
2019-01-29 Multi-Stage Fracture 1738.60 1740.50 0
2019-01-29 Multi-Stage Fracture 1688.50 1690.40 0
2019-01-29 Multi-Stage Fracture 1638.40 1640.30 0
2019-01-29 Multi-Stage Fracture 1599.50 1601.40 0
2019-01-28 Multi-Stage Fracture 2883.40 2885.30 0
2019-01-28 Multi-Stage Fracture 2833.70 2835.60 0
2019-01-28 Multi-Stage Fracture 2784.00 2785.90 0
2019-01-29 Multi-Stage Fracture 2734.20 2736.10 0
2019-01-29 Multi-Stage Fracture 2684.50 2686.40 0
2019-01-29 Multi-Stage Fracture 2634.90 2636.80 0
2019-01-29 Multi-Stage Fracture 2585.20 2587.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-01-28 2019-01-29 1,405 2,409 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 84.2801 N/A
Sand - Tier 2 (20/40) Trican silica crystalline 14808-60-7 100 10.3116 N/A
Sand - Tier 2 (30/50) Trican silica crystalline 14808-60-7 100 5.2083 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0226 N/A
dibromoacetonitrile 3252-43-5 100 0.0226 N/A
non-hazardous ingredients Not Available 100 0.0226 N/A
polyethylene glycol 25322-68-3 100 0.0226 N/A
sodium bromide 7647-15-6 100 0.0226 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0923 N/A
water Not Available 100 0.0923 N/A
FR-22 Trican Friction Reducer distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0445 N/A
non-hazardous ingredients Not Available 100 0.0445 N/A
NMR-1N Trican Surfactant methanol 67-56-1 100 0.0402 N/A
non-hazardous ingredients Not Available 100 0.0402 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-01-28 2019-01-31 Surface Water - Runoff 2520

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 7584 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-01-10 No Incident Encountered 0.00 0.00
2019-01-29 No Incident Encountered 0.00 0.00

For data sources see[10]

References