X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475053212020

Well Details

Well ID: 0475053212020
Loading map...
Location: 02/12-32-047-05W5/0
Location Alias: 02/12-32-47-05 W5M
Location Alias 2: 02/12-32-047-05 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 05
Section: 32
County/Municipality: Brazeau County
Well Name: BONTERRA 102 HZ PEMBINA 12-32-47-5
Operator Name: Bonterra Energy Corp.
License Number: 0471548
License Date: 2014-11-18
License Status: Issued
Spud Date: 2014-11-20
Final Drill Date: 2014-11-26
Well Total Depth: 3277.00 m
Surface Hole Latitude: 53.114867
Surface Hole Longitude: -114.707406

For data sources see[1][2]

Well History

Date Event
2014-11-18 Obtained License
2014-11-21 Direction Drilling Operation Performed - Deviate
2014-11-21 Surface Casing Operation Performed
2014-11-23 Direction Drilling Operation Performed - Horizontal
2014-11-26 Finished Drilling
2014-11-26 Well Mode changed to Drilled and Cased
2014-11-27 Production Casing Operation Performed
2014-11-27 Rig Released
2015-05-02 Well Log Performed
2015-05-09 Perforation Treatment Performed - Multi-Stage Fracture
2015-05-10 Perforation Treatment Performed - Multi-Stage Fracture
2015-06-01 Well Began Production
2015-06-01 Well Fluid changed to Crude Oil
2015-06-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-11-20 Ironhand Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-11-21 564.90 Deviate (5 - 79 degrees)
2014-11-23 1676.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-05-09 Multi-Stage Fracture 3142.50 3143.00 0
2015-05-09 Multi-Stage Fracture 2665.40 2667.30 0
2015-05-09 Multi-Stage Fracture 2614.90 2616.70 0
2015-05-09 Multi-Stage Fracture 2552.40 2554.30 0
2015-05-09 Multi-Stage Fracture 2501.80 2503.60 0
2015-05-09 Multi-Stage Fracture 2439.30 2441.10 0
2015-05-09 Multi-Stage Fracture 2388.60 2390.40 0
2015-05-09 Multi-Stage Fracture 2326.30 2328.20 0
2015-05-09 Multi-Stage Fracture 2275.60 2277.50 0
2015-05-09 Multi-Stage Fracture 2213.20 2215.10 0
2015-05-10 Multi-Stage Fracture 2162.60 2164.50 0
2015-05-09 Multi-Stage Fracture 3117.50 3119.30 0
2015-05-10 Multi-Stage Fracture 2100.50 2102.40 0
2015-05-10 Multi-Stage Fracture 2049.80 2051.60 0
2015-05-10 Multi-Stage Fracture 1987.40 1989.20 0
2015-05-10 Multi-Stage Fracture 1936.70 1938.60 0
2015-05-10 Multi-Stage Fracture 1886.10 1887.90 0
2015-05-10 Multi-Stage Fracture 1835.40 1837.30 0
2015-05-10 Multi-Stage Fracture 1785.00 1786.80 0
2015-05-10 Multi-Stage Fracture 1734.50 1736.40 0
2015-05-09 Multi-Stage Fracture 3066.80 3068.70 0
2015-05-09 Multi-Stage Fracture 3004.40 3006.30 0
2015-05-09 Multi-Stage Fracture 2953.70 2955.60 0
2015-05-09 Multi-Stage Fracture 2891.30 2893.20 0
2015-05-09 Multi-Stage Fracture 2840.70 2842.60 0
2015-05-09 Multi-Stage Fracture 2778.30 2780.20 0
2015-05-09 Multi-Stage Fracture 2727.50 2729.40 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-05-09 2015-05-10 1,424 2,232 N/A
2 2015-05-09 2015-05-09 1,424 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 84.3088 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 10.8926 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 4.3872 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0737 N/A
dibromoacetonitrile 3252-43-5 100 0.0737 N/A
non-hazardous ingredients Not Available 100 0.0737 N/A
polyethylene glycol 25322-68-3 100 0.0737 N/A
sodium bromide 7647-15-6 100 0.0737 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.1854 N/A
non-hazardous ingredients Not Available 100 0.1854 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0463 N/A
propylene glycol 57-55-6 100 0.0463 N/A
FR-12 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0889 N/A
anionic polyacrylamide copolymer 25987-30-8 100 0.0889 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0889 N/A
2 Sand 40/70 Trican silica crystalline 14808-60-7 100 0.4518 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-05-08 2015-05-09 Recycled Fracturing Water (treated at well site) 2269

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 4857 0.0 0.0 0.0
2016 8131 0.0 0.0 0.0
2017 8619 0.0 0.0 0.0
2018 8605 0.0 0.0 0.0
2019 8702 0.0 0.0 0.0
2020 2173 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-11-27 No Incident Encountered 0.00 0.00
2015-05-10 No Incident Encountered 0.00 0.00

For data sources see[10]

References