X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475052912000

Well Details

Well ID: 0475052912000
Loading map...
Location: 00/12-29-047-05W5/0
Location Alias: 00/12-29-47-05 W5M
Location Alias 2: 00/12-29-047-05 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 05
Section: 29
County/Municipality: Brazeau County
Well Name: SDEL HZ PEMBINA 12-29-47-5
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0450276
License Date: 2012-11-19
License Status: Issued
Spud Date: 2012-12-13
Final Drill Date: 2012-12-18
Well Total Depth: 3175.00 m
Surface Hole Latitude: 53.090051
Surface Hole Longitude: -114.676188

For data sources see[1][2]

Well History

Date Event
2012-11-19 Obtained License
2012-12-12 Well Log Performed
2012-12-14 Surface Casing Operation Performed
2012-12-15 Direction Drilling Operation Performed - Deviate
2012-12-17 Direction Drilling Operation Performed - Horizontal
2012-12-18 Finished Drilling
2012-12-18 Well Log Performed
2012-12-18 Well Mode changed to Drilled and Cased
2012-12-20 Production Casing Operation Performed
2012-12-20 Rig Released
2013-01-20 Well Log Performed
2013-01-24 Perforation Treatment Performed - Multi-Stage Fracture
2013-01-24 Perforation Treatment Performed - Open-Hole Completion
2013-01-25 Well Began Production
2013-01-25 Well Fluid changed to Crude Oil
2013-01-25 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-12-13 Nabors Drilling Limited 3 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-12-15 477.20 Deviate (5 - 79 degrees)
2012-12-17 1729.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-01-24 Open Hole/Barefoot Completion 3173.00 3175.00 0
2013-01-24 Multi-Stage Fracture 2570.00 2570.10 0
2013-01-24 Multi-Stage Fracture 2496.20 2496.30 0
2013-01-24 Multi-Stage Fracture 2423.10 2423.20 0
2013-01-24 Multi-Stage Fracture 2349.90 2350.00 0
2013-01-24 Multi-Stage Fracture 2276.90 2277.00 0
2013-01-24 Multi-Stage Fracture 2203.70 2203.80 0
2013-01-24 Multi-Stage Fracture 2130.70 2130.80 0
2013-01-24 Multi-Stage Fracture 2057.70 2057.80 0
2013-01-24 Multi-Stage Fracture 1995.90 1996.00 0
2013-01-24 Multi-Stage Fracture 1922.20 1922.30 0
2013-01-24 Multi-Stage Fracture 3139.30 3139.40 0
2013-01-24 Multi-Stage Fracture 1849.50 1849.60 0
2013-01-24 Multi-Stage Fracture 3071.30 3071.40 0
2013-01-24 Multi-Stage Fracture 2998.50 2998.60 0
2013-01-24 Multi-Stage Fracture 2925.80 2925.90 0
2013-01-24 Multi-Stage Fracture 2853.40 2853.50 0
2013-01-24 Multi-Stage Fracture 2779.10 2779.20 0
2013-01-24 Multi-Stage Fracture 2705.90 2706.00 0
2013-01-24 Multi-Stage Fracture 2632.70 2632.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-01-24 2013-01-24 1,435 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 No specific ingredients Not Available 100 81.5915 N/A
Sand (20/40) Canyon Aluminum Oxide 1344-28-1 100 3.8383 N/A
Crystalline silica. quartz 14808-60-7 100 3.8383 N/A
Iron Oxide 1309-37-1 100 3.8384 N/A
Titanium Oxide 13463-67-7 100 3.8388 N/A
Sand (30/50) Canyon Aluminum Oxide 1344-28-1 100 11.5151 N/A
Crystalline silica. quartz 14808-60-7 100 11.5151 N/A
Iron Oxide 1309-37-1 100 11.5151 N/A
Titanium Oxide 13463-67-7 100 11.5155 N/A
Tolcide PS75LT Canyon Bactericide/Biocide Non-hazardous base ingredient(s) Not Available 100 0.0126 N/A
Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0126 N/A
CAN-1911 Clay Stabilizer Canyon Clay Control 1.6-Hexandiamine. dihydrochloride 6055-52-3 100 0.1778 N/A
Non-hazardous base ingredient(s) Not Available 100 0.1778 N/A
Nitrogen Gas Canyon Energizing Fluid Nitrogen 7727-37-9 100 2.7183 N/A
Non-hazardous base ingredient(s) Not Available 100 2.718 N/A
CAN-2056 Gellant (G50 Microtox EC50) Canyon Gelling Agent Ammonium Chloride 12125-02-9 100 0.0687 N/A
Hydrotreated Kerosene 64742-47-8 100 0.0687 N/A
Non-hazardous base ingredient(s) Not Available 100 0.0687 N/A
CAN-2410 Demulsifier Canyon Surfactant Methyl Alcohol 67-56-1 100 0.0774 N/A
Non-hazardous base ingredient(s) Not Available 100 0.0774 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-01-13 2013-01-20 Surface Water - River 2020

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 6936 0.0 0.0 0.0
2014 8469 0.0 0.0 0.0
2015 8643 0.0 0.0 0.0
2016 8560 0.0 0.0 0.0
2017 8735 0.0 0.0 0.0
2018 7813 0.0 0.0 0.0
2019 8502 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-12-20 No Incident Encountered 0.00 0.00
2013-02-01 No Incident Encountered 0.00 0.00

For data sources see[10]

References