X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475052816020

Well Details

Well ID: 0475052816020
Loading map...
Location: 02/16-28-047-05W5/0
Location Alias: 02/16-28-47-05 W5M
Location Alias 2: 02/16-28-047-05 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 05
Section: 28
County/Municipality: Brazeau County
Well Name: WHITECAP 02 HZ PEMBINA 16-28-47-5
Operator Name: Whitecap Resources Inc.
License Number: 0418032
License Date: 2010-01-28
License Status: Issued
Spud Date: 2010-02-22
Final Drill Date: 2010-03-09
Well Total Depth: 2910.00 m
Surface Hole Latitude: 53.076658
Surface Hole Longitude: -114.665776

For data sources see[1][2]

Well History

Date Event
2010-01-28 Obtained License
2010-02-25 Surface Casing Operation Performed
2010-02-27 Direction Drilling Operation Performed - Horizontal
2010-03-02 Intermediate Casing Operation Performed
2010-03-09 Finished Drilling
2010-03-09 Well Mode changed to Drilled and Cased
2010-03-10 Well Log Performed
2010-03-12 Well Log Performed
2010-03-13 Perforation Treatment Performed - Multi-Stage Fracture
2010-03-13 Perforation Treatment Performed - Open-Hole Completion
2010-03-13 Rig Released
2010-04-29 Well Log Performed
2010-06-01 Well Began Production
2010-06-01 Well Fluid changed to Crude Oil
2010-06-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-02-27 1158.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-03-13 Open Hole/Barefoot Completion 1626.00 2910.00 0
2010-03-13 Multi-Stage Fracture 1949.70 1949.80 0
2010-03-13 Multi-Stage Fracture 1851.10 1851.20 0
2010-03-13 Multi-Stage Fracture 1741.90 1742.00 0
2010-03-13 Multi-Stage Fracture 1640.40 1640.50 0
2010-03-13 Multi-Stage Fracture 2802.80 2802.90 0
2010-03-13 Multi-Stage Fracture 2701.70 2701.80 0
2010-03-13 Multi-Stage Fracture 2589.20 2589.30 0
2010-03-13 Multi-Stage Fracture 2481.80 2481.90 0
2010-03-13 Multi-Stage Fracture 2381.60 2381.70 0
2010-03-13 Multi-Stage Fracture 2274.50 2274.60 0
2010-03-13 Multi-Stage Fracture 2175.40 2175.50 0
2010-03-13 Multi-Stage Fracture 2053.30 2053.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 5056 0.0 0.0 0.0
2011 8395 0.0 0.0 0.0
2012 8267 0.0 0.0 0.0
2013 8692 0.0 0.0 0.0
2014 8603 0.0 0.0 0.0
2015 8511 0.0 0.0 0.0
2016 8656 0.0 0.0 0.0
2017 8519 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 7260 0.0 0.0 0.0
2020 1943 0.0 0.0 0.0

For data sources see[6]

References