X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475052210000

Well Details

Well ID: 0475052210000
Loading map...
Location: 00/10-22-047-05W5/0
Location Alias: 00/10-22-47-05 W5M
Location Alias 2: 00/10-22-047-05 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 05
Section: 22
County/Municipality: Brazeau County
Well Name: ALTEX ET AL PEMBINA 10-22-47-5
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0076374
License Date: 1979-06-14
License Status: RecCertified
Spud Date: 1979-07-08
Final Drill Date: 1979-07-22
Well Total Depth: 1961.00 m
Surface Hole Latitude: 53.071468
Surface Hole Longitude: -114.643616

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-06-14 Obtained License
1979-07-18 Drill Stem Test Performed
1979-07-22 Finished Drilling
1979-07-24 Drill Stem Test Performed
1979-07-26 Production Casing Operation Performed
1979-09-03 Perforation Treatment Performed - Jet Perforation
1979-09-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-10-16 Well Mode changed to Drilled and Cased
1990-03-01 Well Began Production
1990-03-01 Well Fluid changed to Crude Oil
1990-03-01 Well Mode changed to Pumping
1990-07-02 Well Log Performed
1990-07-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-07-03 Plug Back Performed
1990-07-03 Well Fluid changed to Crude Oil
1990-07-03 Well Mode changed to Abandoned Zone
1990-07-07 Well Log Performed
1990-07-08 Perforation Treatment Performed - Jet Perforation
1990-07-11 Perforation Treatment Performed - Fractured
1995-12-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-12-16 Perforation Treatment Performed - Jet Perforation
1995-12-16 Perforation Treatment Performed - Remedial Casing
1995-12-16 Plug Back Performed
1995-12-16 Well Log Performed
1995-12-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-12-18 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-09-03 Perforation 1930.00 1933.00 9
1979-09-05 Acid Treatment 1930.00 1933.00 0
1990-07-03 Packing Device Capped w/Cement 1912.00 1920.00 0
1990-07-08 Perforation 1407.00 1409.00 13
1990-07-11 Fracture 1407.00 1409.00 0
1995-12-16 Packing Device Capped w/Cement 1387.00 1395.00 0
1995-12-16 Perforation 360.00 361.00 14
1995-12-16 Remedial Casing Cementing 360.00 361.00 0
1995-12-17 Packing Device Capped w/Cement 346.70 355.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 616 0.0 0.0 0.0

For data sources see[5]

References