If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0475051913000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.073579,"lon":-114.706542,"icon":""}]} |
| Location: 00/13-19-047-05W5/0 | |
| Location Alias: 00/13-19-47-05 W5M | |
| Location Alias 2: 00/13-19-047-05 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 047 | |
| Meridian: 5 | |
| Range: 05 | |
| Section: 19 | |
| County/Municipality: Brazeau County | |
| Well Name: RIDGEBACK PEMBINA 13-19-47-5 | |
| Operator Name: Ridgeback Resources Inc. | |
| License Number: 0442906 | |
| License Date: 2012-01-16 | |
| License Status: Issued | |
| Spud Date: 2012-02-22 | |
| Final Drill Date: 2012-02-29 | |
| Well Total Depth: 3064.00 m | |
| Surface Hole Latitude: 53.073579 | |
| Surface Hole Longitude: -114.706542 |
| Date | Event |
|---|---|
| 2012-01-16 | Obtained License |
| 2012-02-22 | Surface Casing Operation Performed |
| 2012-02-24 | Direction Drilling Operation Performed - Horizontal |
| 2012-02-29 | Finished Drilling |
| 2012-02-29 | Well Log Performed |
| 2012-02-29 | Well Mode changed to Drilled and Cased |
| 2012-03-01 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-03-01 | Production Casing Operation Performed |
| 2012-03-02 | Rig Released |
| 2012-03-07 | Well Log Performed |
| 2012-03-14 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-03-15 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-03-16 | Well Began Production |
| 2012-03-16 | Well Fluid changed to Crude Oil |
| 2012-03-16 | Well Mode changed to Flowing |
| 2012-03-19 | Well Log Performed |
| 2012-03-29 | Well Log Performed |
| 2014-12-01 | Well Fluid changed to Crude Oil |
| 2014-12-01 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-02-22 | Precision Drilling Corporation | 403 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-02-24 | 1190.00 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-03-01 | Open Hole/Barefoot Completion | 3060.00 | 3064.00 | 0 |
| 2012-03-14 | Multi-Stage Fracture | 2498.90 | 2499.00 | 0 |
| 2012-03-14 | Multi-Stage Fracture | 2429.80 | 2429.90 | 0 |
| 2012-03-14 | Multi-Stage Fracture | 2362.50 | 2362.60 | 0 |
| 2012-03-14 | Multi-Stage Fracture | 2295.00 | 2295.10 | 0 |
| 2012-03-15 | Multi-Stage Fracture | 2225.40 | 2225.50 | 0 |
| 2012-03-15 | Multi-Stage Fracture | 2155.30 | 2155.40 | 0 |
| 2012-03-15 | Multi-Stage Fracture | 2085.80 | 2085.90 | 0 |
| 2012-03-15 | Multi-Stage Fracture | 2029.10 | 2029.20 | 0 |
| 2012-03-15 | Multi-Stage Fracture | 1959.60 | 1959.70 | 0 |
| 2012-03-15 | Multi-Stage Fracture | 1890.80 | 1890.90 | 0 |
| 2012-03-14 | Multi-Stage Fracture | 3036.20 | 3036.30 | 0 |
| 2012-03-15 | Multi-Stage Fracture | 1820.40 | 1820.50 | 0 |
| 2012-03-15 | Multi-Stage Fracture | 1751.00 | 1751.10 | 0 |
| 2012-03-14 | Multi-Stage Fracture | 2960.40 | 2960.50 | 0 |
| 2012-03-14 | Multi-Stage Fracture | 2891.60 | 2891.70 | 0 |
| 2012-03-14 | Multi-Stage Fracture | 2822.70 | 2822.80 | 0 |
| 2012-03-14 | Multi-Stage Fracture | 2768.30 | 2768.40 | 0 |
| 2012-03-14 | Multi-Stage Fracture | 2700.00 | 2700.10 | 0 |
| 2012-03-14 | Multi-Stage Fracture | 2633.20 | 2633.30 | 0 |
| 2012-03-14 | Multi-Stage Fracture | 2566.60 | 2566.70 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 6278 | 0.0 | 0.0 | 0.0 |
| 2013 | 8646 | 0.0 | 0.0 | 0.0 |
| 2014 | 8127 | 0.0 | 0.0 | 0.0 |
| 2015 | 8433 | 0.0 | 0.0 | 0.0 |
| 2016 | 8412 | 0.0 | 0.0 | 0.0 |
| 2017 | 8610 | 0.0 | 0.0 | 0.0 |
| 2018 | 8700 | 0.0 | 0.0 | 0.0 |
| 2019 | 8466 | 0.0 | 0.0 | 0.0 |
| 2020 | 2151 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-04-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]