If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0475041508020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.050561,"lon":-114.469711,"icon":""}]} |
Location: 02/08-15-047-04W5/0 | |
Location Alias: 02/08-15-47-04 W5M | |
Location Alias 2: 02/08-15-047-04 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 5 | |
Range: 04 | |
Section: 15 | |
County/Municipality: County of Wetaskiwin No. 10 | |
Well Name: SDEL 102 HZ PEMBINA 8-15-47-4 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0447754 | |
License Date: 2012-08-14 | |
License Status: Suspension | |
Spud Date: 2012-08-27 | |
Final Drill Date: 2012-09-01 | |
Well Total Depth: 2525.00 m | |
Surface Hole Latitude: 53.050561 | |
Surface Hole Longitude: -114.469711 |
Date | Event |
---|---|
2012-08-14 | Obtained License |
2012-08-27 | Well Log Performed |
2012-08-28 | Surface Casing Operation Performed |
2012-08-28 | Well Log Performed |
2012-08-29 | Direction Drilling Operation Performed - Deviate |
2012-08-29 | Direction Drilling Operation Performed - Horizontal |
2012-08-29 | Well Log Performed |
2012-09-01 | Finished Drilling |
2012-09-01 | Well Log Performed |
2012-09-01 | Well Mode changed to Drilled and Cased |
2012-09-04 | Intermediate Casing Operation Performed |
2012-09-04 | Liner Casing Operation Performed |
2012-09-04 | Rig Released |
2012-09-11 | Well Log Performed |
2012-09-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-09-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-01-20 | Well Log Performed |
2013-03-11 | Well Began Production |
2013-03-11 | Well Fluid changed to Crude Oil |
2013-03-11 | Well Mode changed to Pumping |
2014-04-01 | Well Fluid changed to Crude Oil |
2014-04-01 | Well Mode changed to Suspended |
2016-04-01 | Well Fluid changed to Crude Oil |
2016-04-01 | Well Mode changed to Pumping |
2016-05-01 | Well Fluid changed to Crude Oil |
2016-05-01 | Well Mode changed to Suspended |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-08-27 | Nabors Drilling Limited | 26 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-08-29 | 791.90 | Deviate (5 - 79 degrees) |
2012-08-29 | 1158.20 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-09-14 | Multi-Stage Fracture | 2496.00 | 2496.10 | 0 |
2012-09-21 | Multi-Stage Fracture | 1818.80 | 1818.90 | 0 |
2012-09-21 | Multi-Stage Fracture | 1779.50 | 1779.60 | 0 |
2012-09-21 | Multi-Stage Fracture | 1705.50 | 1705.60 | 0 |
2012-09-21 | Multi-Stage Fracture | 1631.20 | 1631.30 | 0 |
2012-09-21 | Multi-Stage Fracture | 1591.70 | 1591.80 | 0 |
2012-09-21 | Multi-Stage Fracture | 1505.80 | 1505.90 | 0 |
2012-09-21 | Multi-Stage Fracture | 1432.00 | 1432.10 | 0 |
2012-09-21 | Multi-Stage Fracture | 1346.50 | 1346.60 | 0 |
2012-09-21 | Multi-Stage Fracture | 1318.40 | 1318.50 | 0 |
2012-09-21 | Multi-Stage Fracture | 2364.50 | 2364.60 | 0 |
2012-09-21 | Multi-Stage Fracture | 2291.20 | 2291.30 | 0 |
2012-09-21 | Multi-Stage Fracture | 2228.60 | 2228.70 | 0 |
2012-09-21 | Multi-Stage Fracture | 2166.00 | 2166.10 | 0 |
2012-09-21 | Multi-Stage Fracture | 2092.70 | 2092.80 | 0 |
2012-09-21 | Multi-Stage Fracture | 2030.30 | 2030.40 | 0 |
2012-09-21 | Multi-Stage Fracture | 1956.00 | 1956.10 | 0 |
2012-09-21 | Multi-Stage Fracture | 1893.20 | 1893.30 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 216 | 0.0 | 0.0 | 0.0 |
2016 | 72 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-09-04 | No Incident Encountered | 0.00 | 0.00 |
2012-10-01 | No Incident Encountered | 0.00 | 0.00 |
2013-03-10 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]