X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475041209000

Well Details

Well ID: 0475041209000
Loading map...
Location: 00/09-12-047-04W5/0
Location Alias: 00/09-12-47-04 W5M
Location Alias 2: 00/09-12-047-04 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 04
Section: 12
County/Municipality: County of Wetaskiwin No. 10
Well Name: JOURNEY PEMBINA 9-12-47-4
Operator Name: Journey Energy Inc.
License Number: 0145861
License Date: 1990-10-16
License Status: Suspension
Spud Date: 1990-11-14
Final Drill Date: 1990-11-19
Well Total Depth: 1090.00 m
Surface Hole Latitude: 53.041365
Surface Hole Longitude: -114.443680

For data sources see[1][2]

Well History

Date Event
1990-10-16 Obtained License
1990-11-15 Surface Casing Operation Performed
1990-11-19 Finished Drilling
1990-11-19 Well Log Performed
1990-11-19 Well Mode changed to Drilled and Cased
1990-11-20 Production Casing Operation Performed
1990-11-20 Rig Released
1990-11-27 Perforation Treatment Performed - Jet Perforation
1990-11-27 Well Log Performed
1990-11-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-11-29 Perforation Treatment Performed - Fractured
1992-10-12 Well Began Production
1992-10-12 Well Fluid changed to Crude Oil
1992-10-12 Well Mode changed to Flowing
1993-12-31 Well Fluid changed to Crude Oil
1993-12-31 Well Mode changed to Suspended
1997-10-31 Well Fluid changed to Crude Oil
1997-10-31 Well Mode changed to Pumping
1998-06-05 Well Log Performed
2000-06-21 Well Fluid changed to Crude Oil
2000-06-21 Well Mode changed to Suspended
2008-05-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-05-05 Plug Back Performed
2008-05-05 Well Fluid changed to Crude Oil
2008-05-05 Well Log Performed
2008-05-05 Well Mode changed to Abandoned Zone
2008-05-06 Well Log Performed
2008-06-06 Well Log Performed
2008-06-08 Perforation Treatment Performed - Jet Perforation
2008-06-08 Well Log Performed
2008-06-09 Perforation Treatment Performed - Remedial Casing
2008-06-10 Well Log Performed
2008-06-11 Perforation Treatment Performed - Jet Perforation
2008-06-11 Well Log Performed
2008-06-12 Perforation Treatment Performed - Remedial Casing
2008-06-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-11-27 Perforation 1046.80 1049.50 13
2008-06-13 Packing Device Capped w/Cement 237.00 245.00 0
1990-11-27 Perforation 1050.00 1052.60 13
1990-11-28 Acid Treatment 1046.80 1052.60 0
1990-11-29 Fracture 1046.80 1052.60 0
2008-05-05 Packing Device Capped w/Cement 1034.00 1042.00 0
2008-06-08 Perforation 270.00 271.00 14
2008-06-09 Remedial Casing Cementing 270.00 271.00 0
2008-06-11 Perforation 255.00 256.00 14
2008-06-12 Remedial Casing Cementing 255.00 256.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 1786 0.0 0.0 0.0
1993 5178 0.0 0.0 0.0
1997 1642 0.0 0.0 0.0
1998 2016 0.0 0.0 0.0

For data sources see[5]

References