X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475041204000

Well Details

Well ID: 0475041204000
Loading map...
Location: 00/04-12-047-04W5/0
Location Alias: 00/04-12-47-04 W5M
Location Alias 2: 00/04-12-047-04 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 04
Section: 12
County/Municipality: County of Wetaskiwin No. 10
Well Name: DAYLIGHT PEMBINA 4-12-47-4
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0035695
License Date: 1969-01-27
License Status: Suspension
Spud Date: 1969-02-10
Final Drill Date: 1969-02-15
Well Total Depth: 1097.30 m
Surface Hole Latitude: 53.034846
Surface Hole Longitude: -114.460568

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-01-27 Obtained License
1969-02-15 Finished Drilling
1969-02-15 Well Mode changed to Drilled and Cased
1969-02-16 Production Casing Operation Performed
1969-02-25 Perforation Treatment Performed - Jet Perforation
1969-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-03-01 Well Began Production
1969-03-01 Well Fluid changed to Crude Oil
1969-03-01 Well Mode changed to Pumping
1969-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-03-17 Perforation Treatment Performed - Fractured
1978-12-02 Perforation Treatment Performed - Chemical Squeeze
1978-12-06 Well Began Injection
1978-12-06 Well Fluid changed to Water
1978-12-06 Well Type changed to Injection
1995-09-24 Perforation Treatment Performed - Fractured
1995-09-24 Perforation Treatment Performed - Jet Perforation
2004-10-23 Well Fluid changed to Water
2004-10-23 Well Mode changed to Suspended
2004-10-23 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-02-25 Perforation 1077.20 1077.80 7
1995-09-24 Fracture 1065.00 1079.00 0
1969-02-25 Perforation 1078.10 1078.40 3
1969-02-26 Acid Treatment 1077.20 1078.40 0
1969-03-19 Acid Treatment 1077.20 1078.40 0
1972-03-17 Fracture 1077.20 1078.40 0
1978-12-02 Chemical Squeeze 1077.20 1078.40 0
1995-09-24 Perforation 1065.00 1068.00 13
1995-09-24 Perforation 1068.90 1070.50 13
1995-09-24 Perforation 1074.10 1079.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 3162 0.0 0.0 0.0
1970 3342 0.0 0.0 0.0
1971 6632 0.0 0.0 0.0
1972 8250 0.0 0.0 0.0
1973 8118 0.0 0.0 0.0
1974 7210 0.0 0.0 0.0
1975 8363 0.0 0.0 0.0
1976 8100 0.0 0.0 0.0
1977 7504 0.0 0.0 0.0
1978 2628 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0

For data sources see[5]

References