X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475041002000

Well Details

Well ID: 0475041002000
Loading map...
Location: 00/02-10-047-04W5/0
Location Alias: 00/02-10-47-04 W5M
Location Alias 2: 00/02-10-047-04 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 04
Section: 10
County/Municipality: County of Wetaskiwin No. 10
Well Name: DAYLIGHT PEMBINA 2-10-47-4
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0064124
License Date: 1977-06-06
License Status: Abandoned
Spud Date: 1977-07-05
Final Drill Date: 1977-07-09
Well Total Depth: 1057.00 m
Surface Hole Latitude: 53.034448
Surface Hole Longitude: -114.496177

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-06-06 Obtained License
1977-07-09 Finished Drilling
1977-07-09 Well Mode changed to Drilled and Cased
1977-07-10 Production Casing Operation Performed
1977-09-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-09-16 Perforation Treatment Performed - Fractured
1977-09-16 Perforation Treatment Performed - Jet Perforation
1977-10-07 Well Began Production
1977-10-07 Well Fluid changed to Crude Oil
1977-10-07 Well Mode changed to Pumping
1978-03-13 Perforation Treatment Performed - Jet Perforation
1978-03-15 Perforation Treatment Performed - Cement Squeeze
1978-03-17 Perforation Treatment Performed - Acid Wash - No Pressure
1978-03-17 Perforation Treatment Performed - Cement Squeeze
1978-06-30 Perforation Treatment Performed - Fractured
1979-08-01 Well Fluid changed to Crude Oil
1979-08-01 Well Mode changed to Suspended
1996-06-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-06-24 Plug Back Performed
1996-06-27 Well Abandoned
1996-06-27 Well Fluid changed to Crude Oil
1996-06-27 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-09-16 Perforation 1033.00 1033.30 3
1978-03-17 Acid Wash 1008.00 1011.00 0
1978-03-17 Cement Squeeze 1008.00 1011.00 0
1978-06-30 Fracture 1036.60 1039.70 0
1996-06-24 Packing Device Capped w/Cement 989.00 997.00 0
1977-09-16 Perforation 1035.10 1035.40 3
1977-09-16 Perforation 1036.60 1036.90 3
1977-09-16 Perforation 1038.10 1039.70 3
1977-09-16 Acid Treatment 1033.00 1039.70 0
1977-09-16 Fracture 1033.00 1039.70 0
1978-03-13 Perforation 1008.00 1008.90 7
1978-03-13 Perforation 1010.10 1011.00 7
1978-03-15 Cement Squeeze 1033.00 1033.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 672 0.0 0.0 0.0
1978 2587 0.0 0.0 0.0

For data sources see[5]

References