X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475033513020

Well Details

Well ID: 0475033513020
Loading map...
Location: 02/13-35-047-03W5/0
Location Alias: 02/13-35-47-03 W5M
Location Alias 2: 02/13-35-047-03 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 03
Section: 35
County/Municipality: Leduc County
Well Name: DAYLIGHT HZ PEMBINA 13-35-47-3
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0417453
License Date: 2010-01-18
License Status: Amended
Spud Date: 2010-01-24
Final Drill Date: 2010-02-02
Well Total Depth: 2760.00 m
Surface Hole Latitude: 53.103803
Surface Hole Longitude: -114.317194

For data sources see[1][2]

Well History

Date Event
2010-01-18 Obtained License
2010-01-25 Surface Casing Operation Performed
2010-01-29 Direction Drilling Operation Performed - Deviate
2010-01-30 Direction Drilling Operation Performed - Horizontal
2010-02-01 Well Log Performed
2010-02-02 Finished Drilling
2010-02-02 Well Mode changed to Drilled and Cased
2010-02-03 Liner Casing Operation Performed
2010-02-03 Production Casing Operation Performed
2010-02-03 Well Log Performed
2010-02-04 Rig Released
2010-02-21 Perforation Treatment Performed - Multi-Stage Fracture
2010-04-01 Well Began Production
2010-04-01 Well Fluid changed to Crude Oil
2010-04-01 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-01-29 1068.00 Deviate (5 - 79 degrees)
2010-01-30 1378.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-02-21 Multi-Stage Fracture 2749.60 2749.70 0
2010-02-21 Multi-Stage Fracture 1720.00 1720.10 0
2010-02-21 Multi-Stage Fracture 1601.40 1601.50 0
2010-02-21 Multi-Stage Fracture 2642.80 2642.90 0
2010-02-21 Multi-Stage Fracture 2541.60 2541.70 0
2010-02-21 Multi-Stage Fracture 2440.50 2440.60 0
2010-02-21 Multi-Stage Fracture 2350.80 2350.90 0
2010-02-21 Multi-Stage Fracture 2224.80 2224.90 0
2010-02-21 Multi-Stage Fracture 2099.20 2099.30 0
2010-02-21 Multi-Stage Fracture 1973.70 1973.80 0
2010-02-21 Multi-Stage Fracture 1847.70 1847.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 6573 0.0 0.0 0.0
2011 8550 0.0 0.0 0.0
2012 8587 0.0 0.0 0.0
2013 8613 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8746 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 5327 0.0 0.0 0.0
2018 7409 0.0 0.0 0.0
2019 8566 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References