If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0475032912000 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
| Location: 00/12-29-047-03W5/0 | |
| Location Alias: 00/12-29-47-03 W5M | |
| Location Alias 2: 00/12-29-047-03 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 047 | |
| Meridian: 5 | |
| Range: 03 | |
| Section: 29 | |
| County/Municipality: Brazeau County | |
| Well Name: BEL HZ PEMBINA 12-29-47-3 | |
| Operator Name: Sifton Petroleum Inc. | |
| License Number: 0417075 | |
| License Date: 2010-01-11 | |
| License Status: Amended | |
| Spud Date: 2010-01-22 | |
| Final Drill Date: 2010-01-31 | |
| Well Total Depth: 2800.00 m | |
| Surface Hole Latitude: 53.085667 | |
| Surface Hole Longitude: -114.391129 |
| Date | Event |
|---|---|
| 2010-01-11 | Obtained License |
| 2010-01-23 | Surface Casing Operation Performed |
| 2010-01-25 | Direction Drilling Operation Performed - Horizontal |
| 2010-01-26 | Well Log Performed |
| 2010-01-27 | Intermediate Casing Operation Performed |
| 2010-01-28 | Well Log Performed |
| 2010-01-31 | Finished Drilling |
| 2010-01-31 | Well Log Performed |
| 2010-01-31 | Well Mode changed to Drilled and Cased |
| 2010-02-02 | Liner Casing Operation Performed |
| 2010-02-03 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2010-02-03 | Rig Released |
| 2010-02-17 | Perforation Treatment Performed - Open-Hole Completion |
| 2010-03-08 | Well Began Production |
| 2010-03-08 | Well Fluid changed to Crude Oil |
| 2010-03-08 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2010-01-25 | 1062.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2010-02-03 | Multi-Stage Fracture | 2758.80 | 2758.90 | 0 |
| 2010-02-03 | Multi-Stage Fracture | 1790.70 | 1790.80 | 0 |
| 2010-02-03 | Multi-Stage Fracture | 1671.80 | 1671.90 | 0 |
| 2010-02-03 | Multi-Stage Fracture | 1567.20 | 1567.30 | 0 |
| 2010-02-17 | Open Hole/Barefoot Completion | 1505.00 | 2800.00 | 0 |
| 2010-02-03 | Multi-Stage Fracture | 2647.80 | 2647.90 | 0 |
| 2010-02-03 | Multi-Stage Fracture | 2543.20 | 2543.30 | 0 |
| 2010-02-03 | Multi-Stage Fracture | 2439.80 | 2439.90 | 0 |
| 2010-02-03 | Multi-Stage Fracture | 2321.20 | 2321.30 | 0 |
| 2010-02-03 | Multi-Stage Fracture | 2219.20 | 2219.30 | 0 |
| 2010-02-03 | Multi-Stage Fracture | 2114.40 | 2114.50 | 0 |
| 2010-02-03 | Multi-Stage Fracture | 1999.00 | 1999.10 | 0 |
| 2010-02-03 | Multi-Stage Fracture | 1894.60 | 1894.70 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2010 | 6946 | 0.0 | 0.0 | 0.0 |
| 2011 | 8437 | 0.0 | 0.0 | 0.0 |
| 2012 | 8412 | 0.0 | 0.0 | 0.0 |
| 2013 | 8605 | 0.0 | 0.0 | 0.0 |
| 2014 | 8759 | 0.0 | 0.0 | 0.0 |
| 2015 | 8759 | 0.0 | 0.0 | 0.0 |
| 2016 | 8325 | 0.0 | 0.0 | 0.0 |
| 2017 | 8759 | 0.0 | 0.0 | 0.0 |
| 2018 | 8759 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]