X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475032104000

Well Details

Well ID: 0475032104000
Loading map...
Location: 00/04-21-047-03W5/0
Location Alias: 00/04-21-47-03 W5M
Location Alias 2: 00/04-21-047-03 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 03
Section: 21
County/Municipality: Brazeau County
Well Name: ESSO CHEVRON PEMBINA 4-21-47-3
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0029123
License Date: 1965-10-07
License Status: RecCertified
Spud Date: 1965-10-13
Final Drill Date: 1965-10-18
Well Total Depth: 1039.40 m
Surface Hole Latitude: 53.063186
Surface Hole Longitude: -114.388686

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-10-07 Obtained License
1965-10-18 Finished Drilling
1965-10-18 Well Mode changed to Drilled and Cased
1965-10-19 Production Casing Operation Performed
1965-10-21 Perforation Treatment Performed - Bullet Perforation
1965-10-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-10-22 Perforation Treatment Performed - Fractured
1965-11-14 Well Began Production
1965-11-14 Well Fluid changed to Crude Oil
1965-11-14 Well Mode changed to Pumping
1970-09-30 Well Fluid changed to Crude Oil
1970-09-30 Well Mode changed to Suspended
1970-11-30 Well Fluid changed to Crude Oil
1970-11-30 Well Mode changed to Pumping
1982-09-14 Well Fluid changed to Crude Oil
1982-09-14 Well Mode changed to Suspended
1995-07-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-07-28 Perforation Treatment Performed - Cement Plug
1995-07-28 Perforation Treatment Performed - Jet Perforation
1995-07-28 Perforation Treatment Performed - Remedial Casing
1995-07-28 Plug Back Performed
1995-07-28 Well Abandoned
1995-07-28 Well Fluid changed to Crude Oil
1995-07-28 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-10-21 Bullet Perforation 1006.80 1008.60 3
1965-10-22 Acid Treatment 1006.80 1008.60 0
1965-10-22 Fracture 1006.80 1008.60 0
1995-07-28 Packing Device Capped w/Cement 987.00 995.00 0
1995-07-28 Perforation 243.00 243.50 13
1995-07-28 Remedial Casing Cementing 243.00 243.50 0
1995-07-28 Cement Plug 118.70 243.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8651 0.0 0.0 0.0
1968 8619 0.0 0.0 0.0
1969 8577 0.0 0.0 0.0
1970 7135 0.0 0.0 0.0
1971 8200 0.0 0.0 0.0
1972 7580 0.0 0.0 0.0
1973 7674 0.0 0.0 0.0
1974 6628 0.0 0.0 0.0
1975 4560 0.0 0.0 0.0
1976 6672 0.0 0.0 0.0
1977 6480 0.0 0.0 0.0
1978 6816 0.0 0.0 0.0
1979 4362 0.0 0.0 0.0
1980 6504 0.0 0.0 0.0
1981 7864 0.0 0.0 0.0
1982 6143 0.0 0.0 0.0

For data sources see[5]

References