X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475031612020

Well Details

Well ID: 0475031612020
Loading map...
Location: 02/12-16-047-03W5/0
Location Alias: 02/12-16-47-03 W5M
Location Alias 2: 02/12-16-047-03 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 03
Section: 16
County/Municipality: County of Wetaskiwin No. 10
Well Name: DAYLIGHT ETAL 102 PEMBINA 12-16-47-3
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0427197
License Date: 2010-12-07
License Status: Issued
Spud Date: 2011-09-18
Final Drill Date: 2011-10-01
Well Total Depth: 2660.00 m
Surface Hole Latitude: 53.056162
Surface Hole Longitude: -114.363093

For data sources see[1][2]

Well History

Date Event
2010-12-07 Obtained License
2011-09-20 Surface Casing Operation Performed
2011-09-21 Well Log Performed
2011-09-22 Direction Drilling Operation Performed - Horizontal
2011-09-25 Intermediate Casing Operation Performed
2011-10-01 Finished Drilling
2011-10-01 Well Log Performed
2011-10-01 Well Mode changed to Drilled and Cased
2011-10-04 Liner Casing Operation Performed
2011-10-04 Rig Released
2011-11-02 Well Log Performed
2011-11-16 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-16 Perforation Treatment Performed - Open-Hole Completion
2011-11-17 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-18 Well Began Production
2011-11-18 Well Fluid changed to Crude Oil
2011-11-18 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-22 620.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-11-16 Open Hole/Barefoot Completion 2655.00 2660.00 0
2011-11-17 Multi-Stage Fracture 1997.10 1997.20 0
2011-11-17 Multi-Stage Fracture 1920.50 1920.60 0
2011-11-17 Multi-Stage Fracture 1846.20 1846.30 0
2011-11-17 Multi-Stage Fracture 1767.70 1767.80 0
2011-11-17 Multi-Stage Fracture 1700.80 1700.90 0
2011-11-17 Multi-Stage Fracture 1623.20 1623.30 0
2011-11-17 Multi-Stage Fracture 1547.10 1547.20 0
2011-11-17 Multi-Stage Fracture 1471.20 1471.30 0
2011-11-17 Multi-Stage Fracture 1393.90 1394.00 0
2011-11-17 Multi-Stage Fracture 1316.50 1316.60 0
2011-11-16 Multi-Stage Fracture 2622.70 2622.80 0
2011-11-16 Multi-Stage Fracture 2528.50 2528.60 0
2011-11-16 Multi-Stage Fracture 2453.00 2453.10 0
2011-11-16 Multi-Stage Fracture 2378.60 2378.70 0
2011-11-16 Multi-Stage Fracture 2303.20 2303.30 0
2011-11-16 Multi-Stage Fracture 2225.90 2226.00 0
2011-11-16 Multi-Stage Fracture 2150.50 2150.60 0
2011-11-17 Multi-Stage Fracture 2074.20 2074.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 604 0.0 0.0 0.0
2012 8610 0.0 0.0 0.0
2013 8478 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8745 0.0 0.0 0.0
2016 8731 0.0 0.0 0.0
2017 6287 0.0 0.0 0.0
2018 8543 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2111 0.0 0.0 0.0

For data sources see[6]

References