If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0475022408000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.069451,"lon":-114.179526,"icon":""}]} |
Location: 00/08-24-047-02W5/0 | |
Location Alias: 00/08-24-47-02 W5M | |
Location Alias 2: 00/08-24-047-02 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 5 | |
Range: 02 | |
Section: 24 | |
County/Municipality: Leduc County | |
Well Name: RIDGEBACK PEMBINA 8-24-47-2 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0455320 | |
License Date: 2013-02-20 | |
License Status: Issued | |
Spud Date: 2013-03-24 | |
Final Drill Date: 2013-04-01 | |
Well Total Depth: 3019.00 m | |
Surface Hole Latitude: 53.069451 | |
Surface Hole Longitude: -114.179526 |
Date | Event |
---|---|
2013-02-20 | Obtained License |
2013-03-25 | Surface Casing Operation Performed |
2013-03-27 | Direction Drilling Operation Performed - Deviate |
2013-03-28 | Direction Drilling Operation Performed - Horizontal |
2013-03-28 | Well Log Performed |
2013-03-29 | Production Casing Operation Performed |
2013-03-31 | Well Log Performed |
2013-04-01 | Finished Drilling |
2013-04-01 | Perforation Treatment Performed - Open-Hole Completion |
2013-04-01 | Rig Released |
2013-04-01 | Well Mode changed to Drilled and Cased |
2013-06-17 | Well Log Performed |
2013-06-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-06-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-07-01 | Well Began Production |
2013-07-01 | Well Fluid changed to Crude Oil |
2013-07-01 | Well Mode changed to Flowing |
2013-07-17 | Well Fluid changed to Crude Oil |
2013-07-17 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-03-24 | Ensign Drilling Inc. | 64 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2013-03-27 | 778.30 | Deviate (5 - 79 degrees) |
2013-03-28 | 1580.10 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-04-01 | Open Hole/Barefoot Completion | 3014.00 | 3019.00 | 0 |
2013-06-28 | Multi-Stage Fracture | 2446.20 | 2446.30 | 0 |
2013-06-28 | Multi-Stage Fracture | 2376.60 | 2376.70 | 0 |
2013-06-28 | Multi-Stage Fracture | 2303.30 | 2303.40 | 0 |
2013-06-28 | Multi-Stage Fracture | 2243.20 | 2243.30 | 0 |
2013-06-28 | Multi-Stage Fracture | 2172.00 | 2172.10 | 0 |
2013-06-28 | Multi-Stage Fracture | 2097.50 | 2097.60 | 0 |
2013-06-28 | Multi-Stage Fracture | 2037.60 | 2037.70 | 0 |
2013-06-28 | Multi-Stage Fracture | 1967.50 | 1967.60 | 0 |
2013-06-28 | Multi-Stage Fracture | 1895.00 | 1895.10 | 0 |
2013-06-28 | Multi-Stage Fracture | 1820.80 | 1820.90 | 0 |
2013-06-27 | Multi-Stage Fracture | 2989.60 | 2989.70 | 0 |
2013-06-28 | Multi-Stage Fracture | 1761.40 | 1761.50 | 0 |
2013-06-28 | Multi-Stage Fracture | 1689.40 | 1689.50 | 0 |
2013-06-27 | Multi-Stage Fracture | 2916.50 | 2916.60 | 0 |
2013-06-27 | Multi-Stage Fracture | 2848.50 | 2848.60 | 0 |
2013-06-27 | Multi-Stage Fracture | 2780.00 | 2780.10 | 0 |
2013-06-27 | Multi-Stage Fracture | 2708.80 | 2708.90 | 0 |
2013-06-27 | Multi-Stage Fracture | 2650.20 | 2650.30 | 0 |
2013-06-27 | Multi-Stage Fracture | 2579.20 | 2579.30 | 0 |
2013-06-27 | Multi-Stage Fracture | 2504.70 | 2504.80 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-06-27 | 2013-06-28 | 1,255 | 2,310 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 82.4805 | N/A | |||
16/30 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 4.0755 | N/A | ||
20/40 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 8.94 | N/A | ||
30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 5.6393 | N/A | ||
Tolcide PS75LT | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.01 | N/A | |
Water | 7732-18-5 | 100 | 0.0108 | N/A | ||||
DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0816 | N/A | |
DWP-949 | Calfrac | Demulsifier | Ethoxylated alcohols | 8300 | 100 | 0.0371 | N/A | |
Ethoxylated phenolic resin | 8300 | 100 | 0.0403 | N/A | ||||
Isobutyl ketone | 8300 | 100 | 0.0374 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.0586 | N/A | ||||
Organic acid salts 1 | 8300 | 100 | 0.0371 | N/A | ||||
Organic acid salts 2 | 8300 | 100 | 0.0395 | N/A | ||||
Organic acid salts 3 | 8300 | 100 | 0.0403 | N/A | ||||
Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 5.091 | N/A | |
DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0286 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-06-27 | 2013-06-28 | Surface Water - Runoff | 2280 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 4084 | 0.0 | 0.0 | 0.0 |
2014 | 8735 | 0.0 | 0.0 | 0.0 |
2015 | 8739 | 0.0 | 0.0 | 0.0 |
2016 | 8747 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8669 | 0.0 | 0.0 | 0.0 |
2019 | 8615 | 0.0 | 0.0 | 0.0 |
2020 | 1904 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-04-01 | No Incident Encountered | 0.00 | 0.00 |
2013-07-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]