If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0475021603000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.06383,"lon":-114.232437,"icon":""}]} |
Location: 00/03-16-047-02W5/0 | |
Location Alias: 00/03-16-47-02 W5M | |
Location Alias 2: 00/03-16-047-02 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 5 | |
Range: 02 | |
Section: 16 | |
County/Municipality: Leduc County | |
Well Name: BONTERRA HZ PEMBINA 3-16-47-2 | |
Operator Name: Bonterra Energy Corp. | |
License Number: 0471745 | |
License Date: 2014-11-19 | |
License Status: Issued | |
Spud Date: 2014-12-07 | |
Final Drill Date: 2014-12-12 | |
Well Total Depth: 3005.00 m | |
Surface Hole Latitude: 53.063830 | |
Surface Hole Longitude: -114.232437 |
Date | Event |
---|---|
2014-11-19 | Obtained License |
2014-12-08 | Surface Casing Operation Performed |
2014-12-09 | Direction Drilling Operation Performed - Deviate |
2014-12-09 | Production Casing Operation Performed |
2014-12-10 | Direction Drilling Operation Performed - Horizontal |
2014-12-12 | Finished Drilling |
2014-12-12 | Well Mode changed to Drilled and Cased |
2014-12-14 | Rig Released |
2015-01-11 | Well Log Performed |
2015-01-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-01-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-01-22 | Well Log Performed |
2015-02-01 | Well Began Production |
2015-02-01 | Well Fluid changed to Crude Oil |
2015-02-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2014-12-07 | Ironhand Drilling Inc. | 1 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-12-09 | 947.80 | Deviate (5 - 79 degrees) |
2014-12-10 | 1462.80 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2015-01-17 | Multi-Stage Fracture | 2909.80 | 2910.70 | 0 |
2015-01-17 | Multi-Stage Fracture | 2394.20 | 2396.10 | 0 |
2015-01-17 | Multi-Stage Fracture | 2331.70 | 2333.60 | 0 |
2015-01-17 | Multi-Stage Fracture | 2280.70 | 2282.60 | 0 |
2015-01-17 | Multi-Stage Fracture | 2218.30 | 2220.20 | 0 |
2015-01-17 | Multi-Stage Fracture | 2167.50 | 2169.40 | 0 |
2015-01-17 | Multi-Stage Fracture | 2105.20 | 2107.00 | 0 |
2015-01-17 | Multi-Stage Fracture | 2054.30 | 2056.10 | 0 |
2015-01-18 | Multi-Stage Fracture | 1991.60 | 1993.50 | 0 |
2015-01-18 | Multi-Stage Fracture | 1940.70 | 1942.60 | 0 |
2015-01-18 | Multi-Stage Fracture | 1878.40 | 1880.30 | 0 |
2015-01-17 | Multi-Stage Fracture | 2848.40 | 2850.30 | 0 |
2015-01-18 | Multi-Stage Fracture | 1827.50 | 1829.40 | 0 |
2015-01-18 | Multi-Stage Fracture | 1764.90 | 1766.80 | 0 |
2015-01-18 | Multi-Stage Fracture | 1714.10 | 1716.00 | 0 |
2015-01-18 | Multi-Stage Fracture | 1651.50 | 1653.30 | 0 |
2015-01-18 | Multi-Stage Fracture | 1600.50 | 1602.40 | 0 |
2015-01-18 | Multi-Stage Fracture | 1537.80 | 1539.70 | 0 |
2015-01-17 | Multi-Stage Fracture | 2785.80 | 2787.70 | 0 |
2015-01-17 | Multi-Stage Fracture | 2734.90 | 2736.70 | 0 |
2015-01-17 | Multi-Stage Fracture | 2672.30 | 2674.20 | 0 |
2015-01-17 | Multi-Stage Fracture | 2621.40 | 2623.30 | 0 |
2015-01-17 | Multi-Stage Fracture | 2558.70 | 2560.60 | 0 |
2015-01-17 | Multi-Stage Fracture | 2507.80 | 2509.70 | 0 |
2015-01-17 | Multi-Stage Fracture | 2445.20 | 2447.10 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-01-17 | 2015-01-18 | 1,292 | 1,955 | N/A |
2 | 2015-01-17 | 2015-01-17 | 1,292 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 83.9293 | N/A | |||
Sand 20/40 | Trican | silica crystalline | 14808-60-7 | 100 | 10.7635 | N/A | ||
Sand 30/50 | Trican | silica crystalline | 14808-60-7 | 100 | 5.1931 | N/A | ||
Busan 94 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0104 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0104 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0104 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0104 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0104 | N/A | ||||
CC-7 | Trican | Clay Control | 1.6-hexanediamine. dihydrochloride | 6055-52-3 | 100 | 0.3609 | N/A | |
water | Not Available | 100 | 0.3609 | N/A | ||||
GNE-1 | Trican | Demulsifier | non-hazardous ingredients | Not Available | 100 | 0.0461 | N/A | |
propylene glycol | 57-55-6 | 100 | 0.0461 | N/A | ||||
GFR-1 | Trican | Friction Reducer | non-hazardous ingredients | Not Available | 100 | 0.1057 | N/A | |
2 | Sand 40/70 | Trican | silica crystalline | 14808-60-7 | 100 | 0.529 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2015-01-12 | 2015-01-14 | Surface Water - Lake | 2237 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2015 | 6842 | 0.0 | 0.0 | 0.0 |
2016 | 8561 | 0.0 | 0.0 | 0.0 |
2017 | 7797 | 0.0 | 0.0 | 0.0 |
2018 | 7836 | 0.0 | 0.0 | 0.0 |
2019 | 8693 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-12-14 | No Incident Encountered | 0.00 | 0.00 |
2015-01-18 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]