X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475021603000

Well Details

Well ID: 0475021603000
Loading map...
Location: 00/03-16-047-02W5/0
Location Alias: 00/03-16-47-02 W5M
Location Alias 2: 00/03-16-047-02 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 02
Section: 16
County/Municipality: Leduc County
Well Name: BONTERRA HZ PEMBINA 3-16-47-2
Operator Name: Bonterra Energy Corp.
License Number: 0471745
License Date: 2014-11-19
License Status: Issued
Spud Date: 2014-12-07
Final Drill Date: 2014-12-12
Well Total Depth: 3005.00 m
Surface Hole Latitude: 53.063830
Surface Hole Longitude: -114.232437

For data sources see[1][2]

Well History

Date Event
2014-11-19 Obtained License
2014-12-08 Surface Casing Operation Performed
2014-12-09 Direction Drilling Operation Performed - Deviate
2014-12-09 Production Casing Operation Performed
2014-12-10 Direction Drilling Operation Performed - Horizontal
2014-12-12 Finished Drilling
2014-12-12 Well Mode changed to Drilled and Cased
2014-12-14 Rig Released
2015-01-11 Well Log Performed
2015-01-17 Perforation Treatment Performed - Multi-Stage Fracture
2015-01-18 Perforation Treatment Performed - Multi-Stage Fracture
2015-01-22 Well Log Performed
2015-02-01 Well Began Production
2015-02-01 Well Fluid changed to Crude Oil
2015-02-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-12-07 Ironhand Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-12-09 947.80 Deviate (5 - 79 degrees)
2014-12-10 1462.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-01-17 Multi-Stage Fracture 2909.80 2910.70 0
2015-01-17 Multi-Stage Fracture 2394.20 2396.10 0
2015-01-17 Multi-Stage Fracture 2331.70 2333.60 0
2015-01-17 Multi-Stage Fracture 2280.70 2282.60 0
2015-01-17 Multi-Stage Fracture 2218.30 2220.20 0
2015-01-17 Multi-Stage Fracture 2167.50 2169.40 0
2015-01-17 Multi-Stage Fracture 2105.20 2107.00 0
2015-01-17 Multi-Stage Fracture 2054.30 2056.10 0
2015-01-18 Multi-Stage Fracture 1991.60 1993.50 0
2015-01-18 Multi-Stage Fracture 1940.70 1942.60 0
2015-01-18 Multi-Stage Fracture 1878.40 1880.30 0
2015-01-17 Multi-Stage Fracture 2848.40 2850.30 0
2015-01-18 Multi-Stage Fracture 1827.50 1829.40 0
2015-01-18 Multi-Stage Fracture 1764.90 1766.80 0
2015-01-18 Multi-Stage Fracture 1714.10 1716.00 0
2015-01-18 Multi-Stage Fracture 1651.50 1653.30 0
2015-01-18 Multi-Stage Fracture 1600.50 1602.40 0
2015-01-18 Multi-Stage Fracture 1537.80 1539.70 0
2015-01-17 Multi-Stage Fracture 2785.80 2787.70 0
2015-01-17 Multi-Stage Fracture 2734.90 2736.70 0
2015-01-17 Multi-Stage Fracture 2672.30 2674.20 0
2015-01-17 Multi-Stage Fracture 2621.40 2623.30 0
2015-01-17 Multi-Stage Fracture 2558.70 2560.60 0
2015-01-17 Multi-Stage Fracture 2507.80 2509.70 0
2015-01-17 Multi-Stage Fracture 2445.20 2447.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-01-17 2015-01-18 1,292 1,955 N/A
2 2015-01-17 2015-01-17 1,292 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 83.9293 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 10.7635 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 5.1931 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0104 N/A
dibromoacetonitrile 3252-43-5 100 0.0104 N/A
non-hazardous ingredients Not Available 100 0.0104 N/A
polyethylene glycol 25322-68-3 100 0.0104 N/A
sodium bromide 7647-15-6 100 0.0104 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.3609 N/A
water Not Available 100 0.3609 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0461 N/A
propylene glycol 57-55-6 100 0.0461 N/A
GFR-1 Trican Friction Reducer non-hazardous ingredients Not Available 100 0.1057 N/A
2 Sand 40/70 Trican silica crystalline 14808-60-7 100 0.529 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-01-12 2015-01-14 Surface Water - Lake 2237

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 6842 0.0 0.0 0.0
2016 8561 0.0 0.0 0.0
2017 7797 0.0 0.0 0.0
2018 7836 0.0 0.0 0.0
2019 8693 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-12-14 No Incident Encountered 0.00 0.00
2015-01-18 No Incident Encountered 0.00 0.00

For data sources see[10]

References