X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475021507000

Well Details

Well ID: 0475021507000
Loading map...
Location: 00/07-15-047-02W5/0
Location Alias: 00/07-15-47-02 W5M
Location Alias 2: 00/07-15-047-02 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 02
Section: 15
County/Municipality: County of Wetaskiwin No. 10
Well Name: SUPTST CPOG PEM 7-15-47-2
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0037573
License Date: 1970-01-12
License Status: RecCertified
Spud Date: 1970-01-15
Final Drill Date: 1970-01-23
Well Total Depth: 989.10 m
Surface Hole Latitude: 53.051064
Surface Hole Longitude: -114.204397

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1970-01-12 Obtained License
1970-01-21 Drill Stem Test Performed
1970-01-23 Drill Stem Test Performed
1970-01-23 Finished Drilling
1970-01-23 Well Mode changed to Drilled and Cased
1970-01-24 Drill Stem Test Performed
1970-01-25 Production Casing Operation Performed
1970-02-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-02-02 Perforation Treatment Performed - Selective Jet Perforations
1970-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-02-03 Perforation Treatment Performed - Fractured
1970-02-03 Perforation Treatment Performed - Selective Jet Perforations
1970-02-25 Well Began Production
1970-02-25 Well Fluid changed to Crude Oil
1970-02-25 Well Mode changed to Pumping
1970-06-03 Perforation Treatment Performed - Jet Perforation
1970-06-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-06-04 Perforation Treatment Performed - Fractured
1970-11-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1970-11-21 Well Fluid changed to Crude Oil
1970-11-21 Well Mode changed to Abandoned Zone
1974-01-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1974-01-15 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-02-02 Selective Jet Perforations 964.10 965.00 0
1970-06-04 Fracture 947.90 950.40 0
1970-11-21 Packing Device Capped w/Cement 954.00 961.60 0
1974-01-15 Packing Device Capped w/Cement 944.90 944.90 0
1970-02-02 Selective Jet Perforations 967.10 968.30 0
1970-02-02 Acid Treatment 964.10 968.30 0
1970-02-03 Selective Jet Perforations 964.10 965.00 0
1970-02-03 Selective Jet Perforations 967.10 968.30 0
1970-02-03 Acid Treatment 964.10 968.30 0
1970-02-03 Fracture 964.10 968.30 0
1970-06-03 Perforation 947.90 950.40 3
1970-06-04 Acid Treatment 947.90 950.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1970 811 0.0 0.0 0.0

For data sources see[5]

References