X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475021016020

Well Details

Well ID: 0475021016020
Loading map...
Location: 02/16-10-047-02W5/0
Location Alias: 02/16-10-47-02 W5M
Location Alias 2: 02/16-10-047-02 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 02
Section: 10
County/Municipality: County of Wetaskiwin No. 10
Well Name: RIDGEBACK PEMBINA 16-10-47-2
Operator Name: Ridgeback Resources Inc.
License Number: 0421143
License Date: 2010-06-14
License Status: Issued
Spud Date: 2010-06-28
Final Drill Date: 2010-07-05
Well Total Depth: 2616.00 m
Surface Hole Latitude: 53.046064
Surface Hole Longitude: -114.218375

For data sources see[1][2]

Well History

Date Event
2010-06-14 Obtained License
2010-06-30 Surface Casing Operation Performed
2010-07-01 Direction Drilling Operation Performed - Horizontal
2010-07-04 Intermediate Casing Operation Performed
2010-07-05 Finished Drilling
2010-07-05 Well Mode changed to Drilled and Cased
2010-07-06 Well Log Performed
2010-07-07 Liner Casing Operation Performed
2010-07-09 Perforation Treatment Performed - Open-Hole Completion
2010-07-09 Rig Released
2010-07-31 Well Log Performed
2010-08-08 Perforation Treatment Performed - Multi-Stage Fracture
2010-08-10 Well Began Production
2010-08-10 Well Fluid changed to Crude Oil
2010-08-10 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-07-01 930.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-07-09 Open Hole/Barefoot Completion 1484.00 2606.00 0
2010-08-08 Multi-Stage Fracture 2156.30 2156.40 0
2010-08-08 Multi-Stage Fracture 2104.90 2105.00 0
2010-08-08 Multi-Stage Fracture 2053.60 2053.70 0
2010-08-08 Multi-Stage Fracture 1990.90 1991.00 0
2010-08-08 Multi-Stage Fracture 1940.50 1940.60 0
2010-08-08 Multi-Stage Fracture 1890.00 1890.10 0
2010-08-08 Multi-Stage Fracture 1839.40 1839.50 0
2010-08-08 Multi-Stage Fracture 1788.10 1788.20 0
2010-08-08 Multi-Stage Fracture 1726.80 1726.90 0
2010-08-08 Multi-Stage Fracture 1676.10 1676.20 0
2010-08-08 Multi-Stage Fracture 2568.20 2568.30 0
2010-08-08 Multi-Stage Fracture 1624.90 1625.00 0
2010-08-08 Multi-Stage Fracture 1574.20 1574.30 0
2010-08-08 Multi-Stage Fracture 2517.80 2517.90 0
2010-08-08 Multi-Stage Fracture 2463.60 2463.70 0
2010-08-08 Multi-Stage Fracture 2412.50 2412.60 0
2010-08-08 Multi-Stage Fracture 2361.60 2361.70 0
2010-08-08 Multi-Stage Fracture 2310.10 2310.20 0
2010-08-08 Multi-Stage Fracture 2258.70 2258.80 0
2010-08-08 Multi-Stage Fracture 2207.50 2207.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 2833 0.0 0.0 0.0
2011 7970 0.0 0.0 0.0
2012 7777 0.0 0.0 0.0
2013 1236 0.0 0.0 0.0
2014 7233 0.0 0.0 0.0
2015 6883 0.0 0.0 0.0
2016 7942 0.0 0.0 0.0
2017 7721 0.0 0.0 0.0
2018 8547 0.0 0.0 0.0
2019 6972 0.0 0.0 0.0
2020 2092 0.0 0.0 0.0

For data sources see[6]

References