X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475020206000

Well Details

Well ID: 0475020206000
Loading map...
Location: 00/06-02-047-02W5/0
Location Alias: 00/06-02-47-02 W5M
Location Alias 2: 00/06-02-047-02 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 02
Section: 02
County/Municipality: County of Wetaskiwin No. 10
Well Name: OHIO PIGEON LAKE 6-2-47-2
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0020656
License Date: 1961-04-21
License Status: RecExempt
Spud Date: 1961-05-06
Final Drill Date: 1961-07-16
Well Total Depth: 2516.10 m
Surface Hole Latitude: 53.023119
Surface Hole Longitude: -114.187429

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-04-21 Obtained License
1961-05-14 Drill Stem Test Performed
1961-05-15 Drill Stem Test Performed
1961-05-26 Drill Stem Test Performed
1961-05-30 Drill Stem Test Performed
1961-06-09 Drill Stem Test Performed
1961-06-12 Drill Stem Test Performed
1961-06-13 Production Casing Operation Performed
1961-06-24 Drill Stem Test Performed
1961-06-26 Drill Stem Test Performed
1961-06-27 Drill Stem Test Performed
1961-07-16 Finished Drilling
1961-07-20 Perforation Treatment Performed - Acid Wash - No Pressure
1961-07-20 Perforation Treatment Performed - Fractured
1961-07-20 Perforation Treatment Performed - Jet Perforation
1961-07-25 Perforation Treatment Performed - Cement Squeeze
1961-07-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1961-07-26 Perforation Treatment Performed - Jet Perforation
1961-07-28 Perforation Treatment Performed - Cement Squeeze
1961-07-29 Perforation Treatment Performed - Cement Squeeze
1961-08-02 Perforation Treatment Performed - Cement Squeeze
1961-08-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-08-05 Perforation Treatment Performed - Bullet Perforation
1961-08-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-10-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1961-11-02 Well Abandoned
1961-11-02 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-07-20 Perforation 1898.60 1901.60 13
1961-08-05 Bullet Perforation 1899.50 1901.00 26
1961-08-05 Acid Treatment 1899.50 1901.00 0
1961-08-06 Acid Treatment 1899.50 1901.00 0
1961-10-21 Packing Device Capped w/Cement 1883.70 1883.70 0
1961-07-20 Acid Wash 1898.60 1901.60 0
1961-07-20 Fracture 1898.60 1901.60 0
1961-07-25 Cement Squeeze 1898.60 1901.60 0
1961-07-26 Packing Device Capped w/Cement 1897.70 1897.70 0
1961-07-26 Perforation 1892.50 1895.60 13
1961-07-28 Cement Squeeze 1892.50 1895.60 0
1961-07-29 Cement Squeeze 1892.50 1895.60 0
1961-08-02 Cement Squeeze 1892.50 1895.60 0

For data sources see[4]



References